GLAZIER FOOTNOTE: ADDITIONAL $1.25 PER HOUR FOR WORK IN A CONDOR, FROM THE THIRD FLOOR AND UP ADDITIONAL $1.25 PER HOUR FOR WORK ON THE OUTSIDE OF THE — Prevailing Wage Rates
Davis-Bacon prevailing wages for GLAZIER FOOTNOTE: ADDITIONAL $1.25 PER HOUR FOR WORK IN A CONDOR, FROM THE THIRD FLOOR AND UP ADDITIONAL $1.25 PER HOUR FOR WORK ON THE OUTSIDE OF THEs across all covered states and counties. Rates vary by location and construction type.
Across 18 Davis-Bacon rate records nationwide, the median total package (base + fringe) for GLAZIER FOOTNOTE: ADDITIONAL $1.25 PER HOUR FOR WORK IN A CONDOR, FROM THE THIRD FLOOR AND UP ADDITIONAL $1.25 PER HOUR FOR WORK ON THE OUTSIDE OF THE is $83.69/hr, with the middle 80% of counties paying between $83.69 and $83.69/hr. The highest state average is California at $83.69/hr; the lowest is California at $83.69/hr.
Range: $83.69 – $83.69/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2121 — Glaziers.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
18 county-level rates for GLAZIER FOOTNOTE: ADDITIONAL $1.25 PER HOUR FOR WORK IN A CONDOR, FROM THE THIRD FLOOR AND UP ADDITIONAL $1.25 PER HOUR FOR WORK ON THE OUTSIDE OF THE, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Los Angeles | CA | building | $53.05 | $30.64 | $83.69 | WD → |
| Los Angeles | CA | highway | $53.05 | $30.64 | $83.69 | WD → |
| Los Angeles | CA | heavy | $53.05 | $30.64 | $83.69 | WD → |
| Orange | CA | highway | $53.05 | $30.64 | $83.69 | WD → |
| Orange | CA | building | $53.05 | $30.64 | $83.69 | WD → |
| Orange | CA | heavy | $53.05 | $30.64 | $83.69 | WD → |
| Riverside | CA | building | $53.05 | $30.64 | $83.69 | WD → |
| Riverside | CA | heavy | $53.05 | $30.64 | $83.69 | WD → |
| Riverside | CA | highway | $53.05 | $30.64 | $83.69 | WD → |
| San Bernardino | CA | highway | $53.05 | $30.64 | $83.69 | WD → |
| San Bernardino | CA | building | $53.05 | $30.64 | $83.69 | WD → |
| San Bernardino | CA | heavy | $53.05 | $30.64 | $83.69 | WD → |
| Santa Barbara | CA | highway | $53.05 | $30.64 | $83.69 | WD → |
| Santa Barbara | CA | heavy | $53.05 | $30.64 | $83.69 | WD → |
| Santa Barbara | CA | building | $53.05 | $30.64 | $83.69 | WD → |
| Ventura | CA | building | $53.05 | $30.64 | $83.69 | WD → |
| Ventura | CA | highway | $53.05 | $30.64 | $83.69 | WD → |
| Ventura | CA | heavy | $53.05 | $30.64 | $83.69 | WD → |