CONSTRUCTION) Spray Painting, Wallcovering, Sandblasting/Water Hydroblasting, Swing Scaffold or any hanged rigging platform, Epoxies..$ 24.93 19.51 Ta — Prevailing Wage Rates
Davis-Bacon prevailing wages for CONSTRUCTION) Spray Painting, Wallcovering, Sandblasting/Water Hydroblasting, Swing Scaffold or any hanged rigging platform, Epoxies..$ 24.93 19.51 Tas across all covered states and counties. Rates vary by location and construction type.
Across 1 Davis-Bacon rate records nationwide, the median total package (base + fringe) for CONSTRUCTION) Spray Painting, Wallcovering, Sandblasting/Water Hydroblasting, Swing Scaffold or any hanged rigging platform, Epoxies..$ 24.93 19.51 Ta is $44.69/hr, with the middle 80% of counties paying between $44.69 and $44.69/hr. The highest state average is New York at $44.69/hr; the lowest is New York at $44.69/hr.
Range: $44.69 – $44.69/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
1 county-level rates for CONSTRUCTION) Spray Painting, Wallcovering, Sandblasting/Water Hydroblasting, Swing Scaffold or any hanged rigging platform, Epoxies..$ 24.93 19.51 Ta, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Allegany | NY | highway | $25.18 | $19.51 | $44.69 | WD → |