Residential Construction — Chelan, Washington
WD WA20260088-16967-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Chelan, Washington (construction type: residential) is $39.57/hr base + $20.50/hr fringe = $60.07/hr total package (WD WA20260088-16967-res, Rev. 1).
Scroll down for all 21 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $39.57 | $20.50 | $60.07 Above median +34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $19.31 | $10.65 | $29.96 -15% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $31.30 | $15.53 | $46.83 Above median +36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $29.02 | $10.83 | $39.85 -14% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT | $37.56 | $20.93 | $58.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT | $37.22 | $20.93 | $58.15 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT | $37.02 | $20.93 | $57.95 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT | $36.91 | $20.93 | $57.84 | $0.00 | $0.00 | $0.00 | $0.00 |
| FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT | $36.58 | $20.93 | $57.51 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $15.21 | $0.00 | $15.21 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $50.38 | $16.96 | $67.34 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $38.05 | $16.75 | $54.80 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.41 | $0.00 | $26.41 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $17.53 | $0.00 | $17.53 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $29.63 | $0.00 | $29.63 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $24.75 | $5.91 | $30.66 Above median +9% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $25.86 | $2.76 | $28.62 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $23.12 | $2.90 | $26.02 -10% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $36.66 | $27.92 | $64.58 Above median +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $20.84 | $7.30 | $28.14 -37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 8 TRUCKS, SIDE, END, BOTTOM AND ARTICULATED END DUMP FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS RE | $37.88 | $20.93 | $58.81 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Chelan, WA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Chelan, Washington.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.