Building Construction — Chelan, Washington

WD WA20260103-16967-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 120TH MERIDIAN) in Chelan, Washington (construction type: building) is $60.67/hr base + $27.57/hr fringe = $88.24/hr total package (WD WA20260103-16967-bld, Rev. 1).

Scroll down for all 45 trade classifications covered by this determination.

WD Number: WA20260103-16967-bld
Revision: 1
Construction Type: building
State: Washington (WA)
County: Chelan
Effective: May 17, 2026
Trades covered: 45
Official source: SAM.gov reference WA20260103View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
120TH MERIDIAN) $60.67 $27.57 $88.24 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $39.57 $20.50 $60.07 Above median +34% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.21 $17.28 $61.49 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $54.16 $21.27 $75.43 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $53.20 $29.15 $82.35 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YE $67.61 $38.44 $106.05 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $75.37 $18.82 $94.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $57.94 $34.52 $92.46 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $29.62 $7.62 $37.24 Top 10% +35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW CHAIN $51.52 $16.99 $68.51 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FIRE WATCH $40.56 $15.60 $56.16 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORM STRIPPING $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $31.86 $12.98 $44.84 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HOD CARRIER $33.50 $11.08 $44.58 Bottom 10% +62% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACKHAMMER $51.52 $16.99 $68.51 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: NOZZLE PERSON $52.31 $17.01 $69.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $32.17 $11.49 $43.66 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $53.76 $0.00 $53.76 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BLADE FINISH $59.88 $27.57 $87.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $40.53 $9.56 $50.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER: D9 & UNDER $59.23 $27.57 $86.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE PUMP $52.92 $22.63 $75.55 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE: 100 TONS THROUGH 199 TONS, OR 150' OF BOOM $61.56 $27.57 $89.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE: 20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS $59.88 $27.57 $87.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE: 200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS $62.47 $27.57 $90.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE: 45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM $60.67 $27.57 $88.24 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $56.42 $21.15 $77.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $60.67 $27.57 $88.24 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER: OVERHEAD UNDER 6 YARDS $59.88 $27.57 $87.45 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $40.77 $15.91 $56.68 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $36.39 $16.62 $53.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $60.67 $27.57 $88.24 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $55.10 $3.71 $58.81 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $41.24 $14.70 $55.94 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $60.72 $34.15 $94.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $60.72 $34.15 $94.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, EXCLUDES METAL ROOFS $27.00 $0.00 $27.00 Bottom 10% -7% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $45.83 $27.92 $73.75 Above median $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $36.16 $0.00 $36.16 -5% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.26 $11.99 $39.25 +31% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $36.35 $14.57 $50.92 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $55.43 $27.52 $82.95 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $31.81 $16.53 $48.34 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Chelan, WA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Chelan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260103-16967-bld →