Heavy Construction — Windham, Vermont

WD VT20260064-17783-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Windham, Vermont (construction type: heavy) is $22.81/hr base + $13.40/hr fringe = $36.21/hr total package (WD VT20260064-17783-hvy, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: VT20260064-17783-hvy
Revision: 1
Construction Type: heavy
State: Vermont (VT)
County: Windham
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference VT20260064View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $22.81 $13.40 $36.21 Top 10% +21% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $24.56 $12.63 $37.19 +30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING LANDSCAPING AND PIPELAYING $17.90 $1.51 $19.41 -14% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.48 $3.26 $25.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.01 $0.00 $22.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.33 $0.00 $23.33 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $21.26 $0.00 $21.26 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $15.24 $0.29 $15.53 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $18.95 $0.00 $18.95 Above median -30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Windham, VT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Windham

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VT20260064-17783-hvy →