Residential Construction — Tooele, Utah
WD UT20260036-17433-res · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Tooele, Utah (construction type: residential) is $17.92/hr base + $0.00/hr fringe = $17.92/hr total package (WD UT20260036-17433-res, Rev. 1).
Scroll down for all 53 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $17.92 | $0.00 | $17.92 -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES METAL STUD INSTALLATION, AND SIDING INSTALLATION | $15.26 | $0.00 | $15.26 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $36.66 | $11.25 | $47.91 Above median +79% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL FINISHER/TAPER | $17.90 | $1.96 | $19.86 -24% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DRYWALL HANGER | $18.82 | $0.00 | $18.82 Above median -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $16.06 | $1.97 | $18.03 -39% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $18.63 | $6.35 | $24.98 +13% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER | $13.00 | $0.00 | $13.00 -41% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT SHOVELER | $12.95 | $0.00 | $12.95 Bottom 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $11.54 | $3.63 | $15.17 Above median -32% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LANDSCAPE | $10.00 | $0.19 | $10.19 -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER | $12.00 | $0.00 | $12.00 Above median -46% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.95 | $0.00 | $12.95 -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT SCREED | $22.41 | $15.65 | $38.06 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER, OIL DISTRIBUTOR | $24.37 | $15.65 | $40.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: ASPHALT ROLLER, FRONT END LOADER | $23.37 | $15.65 | $39.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR, FRONT END LOADER | $25.37 | $15.65 | $41.02 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: BLADE/GRADER | $25.89 | $15.65 | $41.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: MECHANIC | $27.55 | $15.65 | $43.20 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT: ROLLER | $21.50 | $15.65 | $37.15 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: TRACKHOE | $14.89 | $0.00 | $14.89 | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $11.23 | $0.00 | $11.23 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $30.60 | $10.85 | $41.45 +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $17.14 | $0.00 | $17.14 -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION | $15.31 | $0.00 | $15.31 -47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $38.17 | $25.54 | $63.71 +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 Top 10% +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.37 | $14.65 | $44.02 Bottom 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.56 | $14.65 | $45.21 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.53 | $14.65 | $44.18 +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.34 | $14.65 | $44.99 Above median +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.12 | $14.65 | $44.77 Above median +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.91 | $14.65 | $44.56 +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $29.67 | $14.65 | $44.32 +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE | $30.69 | $14.65 | $45.34 Top 10% +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT | $29.69 | $14.65 | $44.34 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT | $29.53 | $14.65 | $44.18 Above median +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT | $29.42 | $14.65 | $44.07 Bottom 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT.$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BAND | $29.26 | $14.65 | $43.91 Top 10% +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 Above median +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 Top 10% +65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TRANSIT MIX | $29.72 | $14.65 | $44.37 Top 10% +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: TRANSIT MIX.$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 Top 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $29.37 | $14.65 | $44.02 +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $28.60 | $14.65 | $43.25 +51% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $28.33 | $14.65 | $42.98 Bottom 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $31.20 | $14.65 | $45.85 Top 10% +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $31.04 | $14.65 | $45.69 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $29.53 | $14.65 | $44.18 +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $30.66 | $14.65 | $45.31 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $30.59 | $14.65 | $45.24 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK | $27.85 | $14.65 | $42.50 Bottom 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Tooele, UT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Tooele, Utah.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.