Highway Construction — Tooele, Utah

WD UT20260112-17433-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Tooele, Utah (construction type: highway) is $23.39/hr base + $8.59/hr fringe = $31.98/hr total package (WD UT20260112-17433-hwy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: UT20260112-17433-hwy
Revision: 1
Construction Type: highway
State: Utah (UT)
County: Tooele
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference UT20260112View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $23.39 $8.59 $31.98 Above median +29% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.73 $2.79 $23.52 -12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $27.59 $7.78 $35.37 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $17.97 $1.62 $19.59 $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $16.07 $2.66 $18.73 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.61 $11.60 $38.21 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $21.11 $8.65 $29.76 Above median +34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.32 $2.66 $19.98 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $19.31 $7.78 $27.09 Above median +22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.60 $2.66 $17.26 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.89 $3.21 $18.10 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $19.35 $6.64 $25.99 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.95 $6.81 $28.76 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.31 $3.31 $23.62 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $22.56 $6.55 $29.11 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $18.76 $6.55 $25.31 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.66 $10.61 $41.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.44 $15.65 $43.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.40 $15.65 $43.05 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.37 $15.65 $41.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $27.55 $15.65 $43.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT MARKING GRINDER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PUMP $19.18 $4.23 $23.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.85 $15.65 $41.50 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $22.41 $15.65 $38.06 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $31.99 $17.64 $49.63 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $11.31 $1.57 $12.88 $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $20.59 $8.65 $29.24 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.29 $9.09 $31.38 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $24.56 $11.47 $36.03 Top 10% +26% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $26.12 $12.14 $38.26 Top 10% +34% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: VACTOR $23.40 $0.00 $23.40 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.27 $11.09 $35.36 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Tooele, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Tooele

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260112-17433-hwy →