Residential Construction — Davis, Utah

WD UT20260031-17774-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Davis, Utah (construction type: residential) is $17.41/hr base + $0.00/hr fringe = $17.41/hr total package (WD UT20260031-17774-res, Rev. 1).

Scroll down for all 49 trade classifications covered by this determination.

WD Number: UT20260031-17774-res
Revision: 1
Construction Type: residential
State: Utah (UT)
County: Davis
Effective: May 17, 2026
Trades covered: 49
Official source: SAM.gov reference UT20260031View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $17.41 $0.00 $17.41 -36% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES VINYL SIDING INSTALLATION $13.70 $1.71 $15.41 -38% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.67 $1.40 $15.07 -44% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $15.65 $1.98 $17.63 -40% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER $12.95 $0.00 $12.95 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR $18.28 $6.35 $24.63 +11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $10.00 $0.19 $10.19 -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER $12.00 $0.00 $12.00 Above median -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.87 $0.00 $12.87 -42% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT SCREED $22.41 $15.65 $38.06 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER, OIL DISTRIBUTOR $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: ASPHALT ROLLER, FRONT END LOADER $23.37 $15.65 $39.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR, FRONT END LOADER $25.37 $15.65 $41.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: BLADE/GRADER $25.89 $15.65 $41.54 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: MECHANIC $27.55 $15.65 $43.20 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT: ROLLER $21.50 $15.65 $37.15 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $16.14 $0.00 $16.14 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $17.50 $0.86 $18.36 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $30.60 $10.85 $41.45 +40% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $17.14 $0.00 $17.14 -28% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $16.00 $0.00 $16.00 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $15.00 $0.00 $15.00 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: ARTICULATED $32.14 $14.65 $46.79 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE PUMPING $29.62 $14.65 $44.27 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $29.37 $14.65 $44.02 Bottom 10% +54% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $30.56 $14.65 $45.21 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $29.53 $14.65 $44.18 +54% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $30.34 $14.65 $44.99 Above median +57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $30.12 $14.65 $44.77 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $29.91 $14.65 $44.56 +56% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $29.67 $14.65 $44.32 +55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE $30.69 $14.65 $45.34 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT $29.69 $14.65 $44.34 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT $29.53 $14.65 $44.18 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT $29.42 $14.65 $44.07 Bottom 10% +54% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT.$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BAND $29.26 $14.65 $43.91 Top 10% +53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY $32.69 $14.65 $47.34 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL SPREADER $32.68 $14.65 $47.33 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRANSIT MIX $29.72 $14.65 $44.37 Top 10% +55% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRANSIT MIX.$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER $30.19 $14.65 $44.84 Top 10% +57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $29.37 $14.65 $44.02 +54% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $28.60 $14.65 $43.25 +51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $28.33 $14.65 $42.98 Bottom 10% +50% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $31.20 $14.65 $45.85 Top 10% +60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $31.04 $14.65 $45.69 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $29.53 $14.65 $44.18 +54% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $30.66 $14.65 $45.31 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $30.59 $14.65 $45.24 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER, FUEL & OIL TANK $27.85 $14.65 $42.50 Bottom 10% +48% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Davis, UT — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Davis

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260031-17774-res →