Highway Construction — Davis, Utah

WD UT20260106-17774-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Davis, Utah (construction type: highway) is $22.57/hr base + $3.77/hr fringe = $26.34/hr total package (WD UT20260106-17774-hwy, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: UT20260106-17774-hwy
Revision: 1
Construction Type: highway
State: Utah (UT)
County: Davis
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference UT20260106View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $22.57 $3.77 $26.34 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $23.86 $9.33 $33.19 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $35.85 $9.59 $45.44 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $15.07 $2.53 $17.60 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $14.05 $1.62 $15.67 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER - SIGN $16.95 $5.87 $22.82 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $26.61 $13.76 $40.37 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $21.83 $8.65 $30.48 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $21.31 $8.65 $29.96 Above median +35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $21.21 $6.30 $27.51 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $15.45 $2.53 $17.98 Above median -19% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $20.85 $8.65 $29.50 Above median +33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $18.15 $3.54 $21.69 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $22.73 $8.59 $31.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.64 $3.31 $22.95 $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $23.26 $5.52 $28.78 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE FINISHING MACHINE $20.03 $6.55 $26.58 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $30.66 $10.61 $41.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.44 $15.65 $43.09 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $28.35 $15.65 $44.00 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.37 $15.65 $41.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $27.55 $15.65 $43.20 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $23.58 $15.65 $39.23 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.18 $9.73 $31.91 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT MARKING GRINDER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.37 $15.65 $40.02 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $23.37 $15.65 $39.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $21.79 $15.65 $37.44 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $20.59 $8.65 $29.24 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $20.59 $8.65 $29.24 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.82 $11.77 $34.59 Top 10% +21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OIL DISTRIBUTOR TRUCK $25.59 $13.66 $39.25 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: VACTOR $23.40 $0.00 $23.40 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.28 $11.64 $35.92 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Davis, UT — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Davis

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for UT20260106-17774-hwy →