Residential Construction — St Croix, U.S. Virgin Islands

WD VI20260006-20011-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in St Croix, U.S. Virgin Islands (construction type: residential) is $25.00/hr base + $0.00/hr fringe = $25.00/hr total package (WD VI20260006-20011-res, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: VI20260006-20011-res
Revision: 1
Construction Type: residential
State: U.S. Virgin Islands (VI)
County: St Croix
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference VI20260006View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $25.00 $0.00 $25.00 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $22.53 $0.78 $23.31 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $21.05 $1.09 $22.14 $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.86 $0.00 $12.86 $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $20.32 $3.34 $23.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $18.81 $0.00 $18.81 $0.00 $0.00 $0.00 $0.00
PAINTER $19.60 $0.00 $19.60 $0.00 $0.00 $0.00 $0.00
PLUMBER $31.75 $0.00 $31.75 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.00 $0.00 $12.00 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Croix, VI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Croix

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VI20260006-20011-res →