Heavy Construction — St Croix, U.S. Virgin Islands

WD VI20260002-20011-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in St Croix, U.S. Virgin Islands (construction type: heavy) is $8.42/hr base + $0.00/hr fringe = $8.42/hr total package (WD VI20260002-20011-hvy, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: VI20260002-20011-hvy
Revision: 1
Construction Type: heavy
State: U.S. Virgin Islands (VI)
County: St Croix
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference VI20260002View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $8.42 $0.00 $8.42 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $7.41 $0.00 $7.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $7.59 $0.00 $7.59 Bottom 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $7.63 $0.00 $7.63 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSULATION MECHANIC $7.67 $0.17 $7.84 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $7.25 $0.17 $7.42 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORERS $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
LABORERS: JACKHAMMER OPERATORS $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDERS $7.25 $0.17 $7.42 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $8.85 $0.00 $8.85 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER & SANDBLASTER $7.25 $0.17 $7.42 $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $7.77 $0.00 $7.77 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.76 $0.00 $7.76 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $7.68 $0.00 $7.68 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ASPHALT MACHINE OPERATORS $7.62 $0.00 $7.62 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZERS $7.55 $0.00 $7.55 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: CHERRY PICKERS $8.42 $0.00 $8.42 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: DRILLERS $7.25 $0.00 $7.25 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: OILERS $9.55 $0.17 $9.72 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: RIGGERS $8.47 $0.00 $8.47 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the St Croix, VI — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in St Croix

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VI20260002-20011-hvy →