Heavy Construction — Smith, Texas

WD TX20260004-14853-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Smith, Texas (construction type: heavy) is $13.16/hr base + $0.00/hr fringe = $13.16/hr total package (WD TX20260004-14853-hvy, Rev. 1).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: TX20260004-14853-hvy
Revision: 1
Construction Type: heavy
State: Texas (TX)
County: Smith
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference TX20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CEMENT MASON/CONCRETE FINISHER $13.16 $0.00 $13.16 -41% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.87 $0.00 $19.87 -27% vs market $0.00 $0.00 $0.00 $0.00
FORM BUILDER/FORM SETTER $13.38 $0.00 $13.38 Above median $0.00 $0.00 $0.00 $0.00
FORM BUILDER/FORM SETTER $13.93 $0.00 $13.93 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER $11.46 $0.00 $11.46 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER $12.70 $0.00 $12.70 -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER $10.08 $0.00 $10.08 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER $8.50 $0.00 $8.50 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $12.02 $0.00 $12.02 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.12 $0.00 $13.12 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $10.44 $0.00 $10.44 Bottom 10% -56% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.96 $0.00 $11.96 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.10 $0.00 $13.10 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.22 $0.00 $12.22 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.97 $0.00 $12.97 -46% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.85 $0.00 $13.85 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR $13.88 $0.00 $13.88 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER $10.08 $0.00 $10.08 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR $13.62 $0.00 $13.62 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR 50,000 POUNDS OR LESS $13.67 $0.00 $13.67 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCAVATOR OPERATOR OVER 50,000 POUNDS $13.52 $0.00 $13.52 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED $22.05 $0.00 $22.05 Top 10% -8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FRONT END LOADER , OVER 3 CY $12.33 $0.00 $12.33 -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS $13.40 $0.00 $13.40 Above median -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE..$ 16.88 0.00 POWER EQUIPMENT OPERATOR: MECHANIC $17.47 $0.00 $17.47 -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MOTOR GRADER, ROUGH $15.83 $0.00 $15.83 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $10.85 $0.00 $10.85 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR:..$ 12.35 0.00 LABORER: PIPELAYER $14.64 $0.00 $14.64 -39% vs market $0.00 $0.00 $0.00 $0.00
SERVICER $14.11 $0.00 $14.11 Bottom 10% $0.00 $0.00 $0.00 $0.00
STEEL WORKER $17.53 $0.00 $17.53 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $11.95 $0.00 $11.95 -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.75 $0.00 $10.75 -58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $13.41 $0.00 $13.41 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF-ROAD HAULER $10.08 $0.00 $10.08 -60% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TANDEM AXLE TRACTOR W/SEMI TRAILER $12.50 $0.00 $12.50 Bottom 10% -51% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Smith, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Smith

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260004-14853-hvy →