Building Construction — Smith, Texas

WD TX20260269-14853-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ACOUSTICAL CEILING MECHANIC in Smith, Texas (construction type: building) is $13.84/hr base + $0.00/hr fringe = $13.84/hr total package (WD TX20260269-14853-bld, Rev. 1).

Scroll down for all 45 trade classifications covered by this determination.

WD Number: TX20260269-14853-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Smith
Effective: May 17, 2026
Trades covered: 45
Official source: SAM.gov reference TX20260269View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ACOUSTICAL CEILING MECHANIC $13.84 $0.00 $13.84 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $18.33 $2.50 $20.83 -15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $12.48 $0.81 $13.29 -43% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $16.01 $0.38 $16.39 -29% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.23 $0.00 $15.23 -32% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $12.11 $0.00 $12.11 Bottom 10% -50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $30.05 $12.01 $42.06 +54% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $16.28 $3.87 $20.15 -26% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR $51.93 $38.44 $90.37 Bottom 10% +99% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - MECHANICAL $19.77 $7.13 $26.90 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $12.27 $0.00 $12.27 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $20.00 $0.00 $20.00 -16% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.39 $1.03 $11.42 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $12.00 $0.00 $12.00 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $11.36 $0.00 $11.36 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.66 $0.00 $10.66 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.49 $2.13 $14.62 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.60 $0.00 $15.60 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $14.00 $0.27 $14.27 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $16.22 $0.34 $16.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $14.83 $0.00 $14.83 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $15.10 $1.94 $17.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $12.62 $2.42 $15.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.52 $3.33 $20.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $12.70 $0.00 $12.70 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $14.45 $0.00 $14.45 -32% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $39.76 $14.04 $53.80 +91% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $14.37 $0.00 $14.37 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $21.35 $4.55 $25.90 -8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( HYDRAULIC CRANES 59 TONS AND UNDER) $32.35 $13.10 $45.45 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( TOWER CRANE) $32.85 $13.10 $45.95 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $13.75 $0.00 $13.75 -37% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 15.44 1.46 SHEET METAL WORKER $22.73 $7.52 $30.25 +13% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $13.00 $0.00 $13.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $11.22 $0.00 $11.22 Bottom 10% -46% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $14.74 $0.00 $14.74 -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.39 $1.18 $13.57 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Smith, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Smith

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260269-14853-bld →