Residential Construction — Montgomery, Texas

WD TX20260064-14892-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ACOUSTICAL CEILING INSTALLER in Montgomery, Texas (construction type: residential) is $12.50/hr base + $0.00/hr fringe = $12.50/hr total package (WD TX20260064-14892-res, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: TX20260064-14892-res
Revision: 1
Construction Type: residential
State: Texas (TX)
County: Montgomery
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference TX20260064View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ACOUSTICAL CEILING INSTALLER $12.50 $0.00 $12.50 $0.00 $0.00 $0.00 $0.00
BRICKLAYER $16.87 $0.00 $16.87 Bottom 10% -31% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (INCLUDES BATT/BLOWN INSULATION, FORMWORK & OVERHEAD DOOR INSTALLATION $11.66 $1.41 $13.07 -44% vs market $0.00 $0.00 $0.00 $0.00
CARPORT STRUCTURAL SUPPORTS INSTALLER $11.46 $2.61 $14.07 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.09 $0.75 $13.84 -38% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $10.00 $0.00 $10.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $10.00 $0.00 $10.00 -59% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $11.35 $0.00 $11.35 Bottom 10% -59% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR $53.59 $38.44 $92.03 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC.$ 10.52 0.00 GUTTER AND SIDING INSTALLER $12.37 $0.00 $12.37 -52% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $17.21 $0.00 $17.21 Bottom 10% -28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $11.25 $2.35 $13.60 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $17.17 $0.00 $17.17 Bottom 10% -28% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $10.01 $0.00 $10.01 -45% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $8.92 $0.82 $9.74 -47% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: LANDSCAPE AND IRRIGATION $7.60 $0.00 $7.60 -59% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER BRICK $9.87 $0.68 $10.55 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: MASON TENDER CEMENT $9.60 $0.68 $10.28 Top 10% -44% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PLASTER TENDER $11.10 $0.00 $11.10 Above median -40% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $14.21 $0.00 $14.21 -33% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $11.02 $0.00 $11.02 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $15.89 $0.00 $15.89 Bottom 10% -29% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS $14.47 $1.09 $15.56 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $13.67 $0.00 $13.67 -43% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.00 $0.69 $12.69 -47% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.68 $0.00 $12.68 -47% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.35 $0.69 $13.04 -45% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $13.58 $0.00 $13.58 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS $10.00 $0.00 $10.00 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $29.70 $13.85 $43.55 Above median $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYERS, CARPET AND VINYL $16.92 $0.00 $16.92 -18% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTERS $11.60 $1.55 $13.15 -53% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $12.50 $0.00 $12.50 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS $13.61 $0.00 $13.61 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Montgomery, TX — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Montgomery

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260064-14892-res →