Building Construction — Montgomery, Texas

WD TX20260262-14892-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ACOUSTICAL CEILING MECHANIC in Montgomery, Texas (construction type: building) is $16.41/hr base + $3.98/hr fringe = $20.39/hr total package (WD TX20260262-14892-bld, Rev. 1).

Scroll down for all 56 trade classifications covered by this determination.

WD Number: TX20260262-14892-bld
Revision: 1
Construction Type: building
State: Texas (TX)
County: Montgomery
Effective: May 17, 2026
Trades covered: 56
Official source: SAM.gov reference TX20260262View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ACOUSTICAL CEILING MECHANIC $16.41 $3.98 $20.39 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT & FROST INSULATOR $30.20 $12.38 $42.58 +84% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $33.17 $24.92 $58.09 +88% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $19.86 $0.00 $19.86 -19% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $14.87 $0.73 $15.60 -33% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION $18.81 $2.10 $20.91 Bottom 10% -10% vs market $0.00 $0.00 $0.00 $0.00
CAULKER $15.36 $0.00 $15.36 $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $13.37 $0.00 $13.37 -40% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $16.30 $3.71 $20.01 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $17.45 $3.96 $21.41 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $38.50 $10.71 $49.21 +80% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.00 $1.68 $19.68 -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $17.97 $3.37 $21.34 -22% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC: FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR $53.59 $38.44 $92.03 Top 10% +102% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $20.00 $0.00 $20.00 -3% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $13.13 $0.00 $13.13 $0.00 $0.00 $0.00 $0.00
GLAZIER $19.12 $4.41 $23.53 +6% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $12.10 $0.00 $12.10 Bottom 10% -49% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $27.15 $5.66 $32.81 +38% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $28.26 $8.13 $36.39 Bottom 10% +53% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.20 $0.00 $10.20 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $9.49 $0.00 $9.49 -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.37 $0.00 $13.37 -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $10.50 $0.00 $10.50 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.94 $0.00 $12.94 -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ROOF TEAROFF $11.28 $0.00 $11.28 Top 10% -39% vs market $0.00 $0.00 $0.00 $0.00
LATHER $19.73 $0.00 $19.73 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.17 $0.00 $16.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $13.93 $0.00 $13.93 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.77 $0.00 $20.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $16.22 $0.34 $16.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $15.64 $0.00 $15.64 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $13.37 $0.00 $13.37 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.55 $0.94 $14.49 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $17.52 $3.33 $20.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.03 $0.00 $16.03 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.00 $0.00 $16.00 Above median $0.00 $0.00 $0.00 $0.00
PAINTER, EXCLUDES DRYWALL FINISHING/TAPING $16.77 $4.51 $21.28 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $42.09 $12.96 $55.05 +96% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $26.73 $11.13 $37.86 +34% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $31.34 $10.30 $41.64 +86% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $39.98 $11.61 $51.59 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.47 $10.39 $49.86 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.40 $0.00 $15.40 -30% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $29.70 $13.85 $43.55 +62% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $19.67 $2.24 $21.91 -18% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $20.17 $4.77 $24.94 -7% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $22.17 $9.70 $31.87 +13% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $12.00 $0.00 $12.00 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $16.17 $0.00 $16.17 -23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 1/SINGLE AXLE TRUCK $14.95 $5.23 $20.18 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $12.39 $1.18 $13.57 -47% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $19.65 $8.57 $28.22 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SEMI-TRAILER TRUCK $12.50 $0.00 $12.50 Above median -51% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $12.00 $4.11 $16.11 -37% vs market $0.00 $0.00 $0.00 $0.00
WATERPROOFER $14.39 $0.00 $14.39 Bottom 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Montgomery, TX — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.