Heavy Construction — Grayson, Texas

WD TX20260058-14844-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Grayson, Texas (construction type: heavy) is $8.50/hr base + $0.00/hr fringe = $8.50/hr total package (WD TX20260058-14844-hvy, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: TX20260058-14844-hvy
Revision: 1
Construction Type: heavy
State: Texas (TX)
County: Grayson
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference TX20260058View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $8.50 $0.00 $8.50 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $7.79 $0.00 $7.79 Bottom 10% -66% vs market $0.00 $0.00 $0.00 $0.00
CONCRETE FINISHER $8.50 $0.00 $8.50 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $11.43 $0.00 $11.43 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $10.07 $0.00 $10.07 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $7.25 $0.00 $7.25 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: FORM SETTERS $7.25 $0.00 $7.25 -61% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: PIPELAYERS $7.50 $0.00 $7.50 Above median -59% vs market $0.00 $0.00 $0.00 $0.00
MECHANIC $9.20 $0.00 $9.20 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $7.50 $0.00 $7.50 Bottom 10% -65% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $10.96 $0.00 $10.96 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS $8.08 $0.00 $8.08 Above median -66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: FRONT END LOADERS $7.25 $0.00 $7.25 Bottom 10% -70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: MOTOR GRADERS $9.00 $0.00 $9.00 -62% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $7.25 $0.00 $7.25 Bottom 10% -72% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Grayson, TX — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Grayson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for TX20260058-14844-hvy →