Highway Construction — Horry, South Carolina

WD SC20260034-16198-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, FORM WORK ONLY in Horry, South Carolina (construction type: highway) is $14.29/hr base + $0.00/hr fringe = $14.29/hr total package (WD SC20260034-16198-hwy, Rev. 1).

Scroll down for all 42 trade classifications covered by this determination.

WD Number: SC20260034-16198-hwy
Revision: 1
Construction Type: highway
State: South Carolina (SC)
County: Horry
Effective: May 17, 2026
Trades covered: 42
Official source: SAM.gov reference SC20260034View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, FORM WORK ONLY $14.29 $0.00 $14.29 Bottom 10% -39% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, FORM WORK ONLY $13.07 $0.00 $13.07 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, FORM WORK ONLY $13.50 $0.00 $13.50 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.62 $0.00 $14.62 -36% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.33 $0.00 $14.33 -37% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.79 $0.00 $14.79 -35% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $15.35 $0.00 $15.35 -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.07 $0.00 $11.07 -44% vs market $0.00 $0.00 $0.00 $0.00
LABORER $11.61 $0.00 $11.61 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, RAKER, SHOVELER, AND SPREADER $11.62 $0.00 $11.62 -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ASPHALT, INCLUDES ASPHALT DISTRIBUTOR, SHOVELER AND SPREADER $11.54 $0.00 $11.54 -42% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $9.72 $0.00 $9.72 -51% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.69 $0.00 $11.69 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.16 $0.00 $10.16 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.06 $0.00 $10.06 -49% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-CONE SETTER $12.63 $0.00 $12.63 -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER, TRAFFIC CONTROL-CONE SETTER $13.19 $0.00 $13.19 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-CEMENT/CONCRETE $10.40 $0.00 $10.40 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.98 $0.00 $13.98 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.17 $0.00 $15.17 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.84 $0.00 $11.84 Bottom 10% -48% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $11.00 $0.00 $11.00 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: (LOADER) $16.80 $0.00 $16.80 Top 10% -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.04 $0.00 $15.04 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.06 $0.00 $16.06 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.09 $0.00 $16.09 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $15.68 $0.00 $15.68 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $14.81 $0.00 $14.81 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $20.58 $0.00 $20.58 Bottom 10% -10% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $20.08 $0.00 $20.08 Bottom 10% -12% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: CRANE $20.00 $4.73 $24.73 Bottom 10% +8% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $14.61 $0.00 $14.61 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $19.48 $0.00 $19.48 -15% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $19.21 $0.00 $19.21 -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $19.07 $0.00 $19.07 -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $13.29 $0.00 $13.29 Bottom 10% -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PAVER $18.85 $0.00 $18.85 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $12.71 $0.00 $12.71 -44% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $13.56 $0.00 $13.56 Bottom 10% -41% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $13.28 $0.00 $13.28 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $10.67 $0.00 $10.67 Bottom 10% -57% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $15.55 $0.00 $15.55 -38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Horry, SC — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Horry

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260034-16198-hwy →