Building Construction — Horry, South Carolina

WD SC20260026-16198-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Horry, South Carolina (construction type: building) is $18.00/hr base + $0.00/hr fringe = $18.00/hr total package (WD SC20260026-16198-bld, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: SC20260026-16198-bld
Revision: 1
Construction Type: building
State: South Carolina (SC)
County: Horry
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference SC20260026View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.00 $0.00 $18.00 -14% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $16.32 $1.50 $17.82 -24% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK..$ 17.21 3.02 CARPENTER $14.09 $2.22 $16.31 -31% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $14.77 $0.00 $14.77 -35% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $18.15 $0.00 $18.15 -35% vs market $0.00 $0.00 $0.00 $0.00
HVAC MECHANIC $19.36 $2.62 $21.98 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.88 $1.43 $11.31 -43% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-BRICK/CONCRETE/CEMENT/STONE..$ 11.00 0.00 LABORER: LANDSCAPE $9.45 $0.49 $9.94 Top 10% -50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.69 $2.08 $16.77 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $17.04 $0.25 $17.29 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $17.07 $2.65 $19.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $19.39 $2.02 $21.41 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $17.59 $1.56 $19.15 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $14.18 $1.99 $16.17 $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $12.36 $0.00 $12.36 -40% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $36.00 $14.19 $50.19 +90% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $18.87 $5.55 $24.42 -7% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $12.11 $0.00 $12.11 -45% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.05 $3.18 $17.23 Above median -31% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Horry, SC — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Horry

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for SC20260026-16198-bld →