Heavy Construction — Klamath, Oregon

WD OR20260071-14440-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM T in Klamath, Oregon (construction type: heavy) is $50.27/hr base + $16.90/hr fringe = $67.17/hr total package (WD OR20260071-14440-hvy, Rev. 2).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: OR20260071-14440-hvy
Revision: 2
Construction Type: heavy
State: Oregon (OR)
County: Klamath
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference OR20260071View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ABOVE MENTIONED CITIES SHALL RECEIVE ZONE I PAY FOR ALL CLASSIFICATIONS. ALL JOBS OR PROJECTS LOCATED MORE THAN 30 MILES AND LESS THAN 50 MILES FROM T $50.27 $16.90 $67.17 $0.00 $0.00 $0.00 $0.00
CARPENTER $53.94 $16.81 $70.75 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $23.50 $9.27 $32.77 +11% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.13 $8.90 $30.03 +0% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.04 $21.84 $68.88 Above median +47% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $23.88 $7.45 $31.33 Above median +30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FENCE ERECTION $23.88 $7.45 $31.33 Above median +30% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $19.31 $5.31 $24.62 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.52 $4.51 $25.03 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $43.79 $17.05 $60.84 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 ASPHALT SPREADER $39.11 $17.30 $56.41 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 GRADE CHECKER $40.41 $17.30 $57.71 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: GROUNDMAN $31.36 $7.27 $38.63 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $59.35 $22.38 $81.73 Above median +169% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $22.77 $7.90 $30.67 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $32.31 $6.43 $38.74 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $30.12 $6.23 $36.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $32.31 $6.43 $38.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $27.59 $2.96 $30.55 Above median $0.00 $0.00 $0.00 $0.00
PAINTERS $39.94 $16.68 $56.62 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $60.77 $34.72 $95.49 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
TOWER ATTACHMENTS; ZONE DIFFERENTIAL: ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING CITIES: ALBANY; BEND; COOS BAY; EUGENE; GRANTS PASS; KLAMATH FAL $56.66 $16.90 $73.56 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.79 $5.95 $29.74 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $31.81 $6.33 $38.14 Top 10% +30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $26.12 $6.53 $32.65 Above median +11% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Klamath, OR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Klamath

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OR20260071-14440-hvy →