Building Construction — Klamath, Oregon

WD OR20260093-14440-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Klamath, Oregon (construction type: building) is $49.60/hr base + $25.15/hr fringe = $74.75/hr total package (WD OR20260093-14440-bld, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: OR20260093-14440-bld
Revision: 1
Construction Type: building
State: Oregon (OR)
County: Klamath
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference OR20260093View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $49.60 $25.15 $74.75 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $38.10 $8.97 $47.07 +60% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $46.13 $20.31 $66.44 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $45.52 $22.03 $67.55 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $52.12 $24.37 $76.49 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING $40.48 $19.97 $60.45 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $62.02 $22.36 $84.38 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $39.11 $17.30 $56.41 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $40.41 $17.30 $57.71 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HOD CARRIER $43.79 $17.05 $60.84 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $43.79 $17.05 $60.84 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $40.41 $17.30 $57.71 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $54.75 $16.90 $71.65 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $53.60 $16.90 $70.50 Top 10% $0.00 $0.00 $0.00 $0.00
PLUMBER $60.77 $34.72 $95.49 Top 10% +113% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $54.99 $33.92 $88.91 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Klamath, OR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Klamath

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OR20260093-14440-bld →