Heavy Construction — Douglas, Oregon

WD OR20260066-14436-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS in Douglas, Oregon (construction type: heavy) is $53.60/hr base + $16.90/hr fringe = $70.50/hr total package (WD OR20260066-14436-hvy, Rev. 2).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: OR20260066-14436-hvy
Revision: 2
Construction Type: heavy
State: Oregon (OR)
County: Douglas
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference OR20260066View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS $53.60 $16.90 $70.50 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $23.20 $9.47 $32.67 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $46.13 $20.31 $66.44 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $50.03 $24.00 $74.03 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (DOUGLAS COUNTY) $47.04 $21.84 $68.88 +47% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.72 $5.99 $24.71 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $17.61 $5.96 $23.57 Above median -2% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $43.79 $17.05 $60.84 Top 10% +153% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 ASPHALT SPREADER $39.11 $17.30 $56.41 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 GRADE CHECKER; PIPELAYER; ASPHALT RAKER $40.41 $17.30 $57.71 +140% vs market $0.00 $0.00 $0.00 $0.00
OILER;FORKLIFT; ROLLER $45.81 $16.90 $62.71 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $22.77 $7.90 $30.67 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $32.31 $6.43 $38.74 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $21.68 $5.88 $27.56 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.84 $6.14 $25.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $27.59 $2.96 $30.55 Above median $0.00 $0.00 $0.00 $0.00
PAINTERS $39.94 $16.68 $56.62 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER $60.98 $16.90 $77.88 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 CRANE: CABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS; TOWER $54.75 $16.90 $71.65 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 CRANE: HYDRAULIC CRANE OPERATOR, UNDER 50 TONS; LATTICE BOOM CRANE OPERATOR: LATTICE BOOM CRANE OPERATOR, UNDER 50 TO $50.27 $16.90 $67.17 Top 10% +105% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE/BACKHOE HYDRAULIC: TRACK TYPE UP TO AND INCLUDING 20,000 LBS, WHEEL TYPE; BOOM TRUCK OPERATOR; DRILLING: CHU $49.03 $16.90 $65.93 +101% vs market $0.00 $0.00 $0.00 $0.00
TOWER ATTACHMENTS $56.66 $16.90 $73.56 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS; WATER TRUCK UP TO 3,000 GALLONS $35.41 $18.30 $53.71 +83% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU.; WATER TRUCK OVER 3,000 TO 5,000 GALLONS $35.57 $18.30 $53.87 +83% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS; WATER TRUC $35.74 $18.30 $54.04 +84% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS; WATER T $36.08 $18.30 $54.38 +85% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS $36.35 $18.30 $54.65 +86% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS $36.57 $18.30 $54.87 +87% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS WATER TRUC $36.82 $18.30 $55.12 +87% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $31.81 $6.33 $38.14 Top 10% +30% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Douglas, OR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Douglas

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OR20260066-14436-hvy →