Heavy Construction — Douglas, Oregon
WD OR20260066-14436-hvy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS in Douglas, Oregon (construction type: heavy) is $53.60/hr base + $16.90/hr fringe = $70.50/hr total package (WD OR20260066-14436-hvy, Rev. 2).
Scroll down for all 31 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS | $53.60 | $16.90 | $70.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $23.20 | $9.47 | $32.67 Above median +11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.03 | $24.00 | $74.03 Above median +58% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DOUGLAS COUNTY) | $47.04 | $21.84 | $68.88 +47% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $48.31 | $34.52 | $82.83 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $18.72 | $5.99 | $24.71 Above median +3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: FLAGGER | $17.61 | $5.96 | $23.57 Above median -2% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS | $43.79 | $17.05 | $60.84 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 ASPHALT SPREADER | $39.11 | $17.30 | $56.41 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 GRADE CHECKER; PIPELAYER; ASPHALT RAKER | $40.41 | $17.30 | $57.71 +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OILER;FORKLIFT; ROLLER | $45.81 | $16.90 | $62.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $22.77 | $7.90 | $30.67 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $32.31 | $6.43 | $38.74 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: EXCAVATOR | $21.68 | $5.88 | $27.56 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $19.84 | $6.14 | $25.98 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER | $27.59 | $2.96 | $30.55 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $39.94 | $16.68 | $56.62 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANE: OPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER | $60.98 | $16.90 | $77.88 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 CRANE: CABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS; TOWER | $54.75 | $16.90 | $71.65 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 CRANE: HYDRAULIC CRANE OPERATOR, UNDER 50 TONS; LATTICE BOOM CRANE OPERATOR: LATTICE BOOM CRANE OPERATOR, UNDER 50 TO | $50.27 | $16.90 | $67.17 Top 10% +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE/BACKHOE HYDRAULIC: TRACK TYPE UP TO AND INCLUDING 20,000 LBS, WHEEL TYPE; BOOM TRUCK OPERATOR; DRILLING: CHU | $49.03 | $16.90 | $65.93 +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TOWER ATTACHMENTS | $56.66 | $16.90 | $73.56 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS; WATER TRUCK UP TO 3,000 GALLONS | $35.41 | $18.30 | $53.71 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU.; WATER TRUCK OVER 3,000 TO 5,000 GALLONS | $35.57 | $18.30 | $53.87 +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS; WATER TRUC | $35.74 | $18.30 | $54.04 +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS; WATER T | $36.08 | $18.30 | $54.38 +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.35 | $18.30 | $54.65 +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS | $36.57 | $18.30 | $54.87 +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS WATER TRUC | $36.82 | $18.30 | $55.12 +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: OFF THE ROAD TRUCK | $31.81 | $6.33 | $38.14 Top 10% +30% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Douglas, OR — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Douglas
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Douglas, Oregon.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.