Building Construction — Douglas, Oregon
WD OR20260085-14436-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Douglas, Oregon (construction type: building) is $49.60/hr base + $25.15/hr fringe = $74.75/hr total package (WD OR20260085-14436-bld, Rev. 1).
Scroll down for all 15 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $49.60 | $25.15 | $74.75 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $32.68 | $13.09 | $45.77 +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 | $66.44 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $50.97 | $23.90 | $74.87 Above median +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT & FROST INSULATOR | $62.02 | $22.36 | $84.38 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $48.31 | $34.52 | $82.83 Above median +91% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $25.48 | $12.09 | $37.57 Top 10% +56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: HOD CARRIER | $43.79 | $17.05 | $60.84 Above median +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $43.79 | $17.05 | $60.84 Top 10% +153% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $40.41 | $17.30 | $57.71 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $54.75 | $16.90 | $71.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $53.60 | $16.90 | $70.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $60.77 | $34.72 | $95.49 Top 10% +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $54.99 | $33.92 | $88.91 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: HVAC DUCT AND UNIT INSTALLATION ONLY | $45.09 | $30.40 | $75.49 +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Douglas, OR — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Douglas
Compliance Notes
- This wage determination applies to federal contracts for building construction in Douglas, Oregon.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.