Building Construction — Sequoyah, Oklahoma
WD OK20260054-14427-bld · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Sequoyah, Oklahoma (construction type: building) is $26.92/hr base + $13.09/hr fringe = $40.01/hr total package (WD OK20260054-14427-bld, Rev. 2).
Scroll down for all 25 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $26.92 | $13.09 | $40.01 +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $15.86 | $0.00 | $15.86 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $14.26 | $1.27 | $15.53 -31% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (LE FLORE AND SEQUOYAH COUNTIES) | $38.38 | $12.89 | $51.27 +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (LEFLORE AND SEQUOYAH COUNTIES) | $30.03 | $14.03 | $44.06 +53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $9.63 | $0.00 | $9.63 -50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - BRICK | $12.52 | $0.00 | $12.52 -35% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.00 | $1.91 | $14.91 Above median -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $12.39 | $0.00 | $12.39 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER | $35.40 | $19.05 | $54.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.38 | $4.08 | $21.46 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $20.64 | $2.35 | $22.99 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $14.28 | $1.70 | $15.98 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER | $16.18 | $0.00 | $16.18 | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER | $36.65 | $16.03 | $52.68 +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $36.65 | $16.48 | $53.13 Above median +102% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER | $27.25 | $19.05 | $46.30 Top 10% +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT | $28.77 | $19.05 | $47.82 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $26.30 | $10.34 | $36.64 +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $35.49 | $14.60 | $50.09 +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 22.18 5.06 PAINTER: BRUSH, ROLLER AND SPRAY | $12.22 | $0.00 | $12.22 -61% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP AND FLATBED TRUCK | $11.00 | $0.00 | $11.00 Above median -56% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Sequoyah, OK — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Sequoyah
Compliance Notes
- This wage determination applies to federal contracts for building construction in Sequoyah, Oklahoma.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.