Heavy Construction — Comanche, Oklahoma

WD OK20260023-16841-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CAPACITY CRANES. ALL TOWER CRANES in Comanche, Oklahoma (construction type: heavy) is $38.09/hr base + $19.05/hr fringe = $57.14/hr total package (WD OK20260023-16841-hvy, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: OK20260023-16841-hvy
Revision: 1
Construction Type: heavy
State: Oklahoma (OK)
County: Comanche
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference OK20260023View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 Top 10% $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $33.52 $15.88 $49.40 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $51.00 $23.80 $74.80 Above median +159% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $11.77 $0.00 $11.77 $0.00 $0.00 $0.00 $0.00
IRONWORKER $32.10 $17.38 $49.48 +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $11.81 $1.09 $12.90 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $11.13 $0.00 $11.13 -42% vs market $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 Top 10% $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $17.15 $0.78 $17.93 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $13.51 $0.00 $13.51 $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $19.61 $9.39 $29.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $16.00 $1.55 $17.55 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACKHOE $17.50 $2.78 $20.28 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE; EXCAVATOR , BACKHOE AN $34.07 $19.05 $53.12 +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 ROLLER $30.87 $19.05 $49.92 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP10 OILER $27.25 $19.05 $46.30 +104% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER ( DUMP TRUCK) $30.85 $16.65 $47.50 +90% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Comanche, OK — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Comanche

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for OK20260023-16841-hvy →