Building Construction — Comanche, Oklahoma

WD OK20260043-16841-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Comanche, Oklahoma (construction type: building) is $26.92/hr base + $13.09/hr fringe = $40.01/hr total package (WD OK20260043-16841-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: OK20260043-16841-bld
Revision: 1
Construction Type: building
State: Oklahoma (OK)
County: Comanche
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference OK20260043View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $26.92 $13.09 $40.01 +76% vs market $0.00 $0.00 $0.00 $0.00
CAPACITY CRANES. ALL TOWER CRANES $38.09 $19.05 $57.14 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $15.50 $2.80 $18.30 -20% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES DRYWALL HANGING $15.50 $2.80 $18.30 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.72 $0.00 $16.72 -26% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $13.80 $0.00 $13.80 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $41.40 $13.14 $54.54 +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $20.08 $5.43 $25.51 -12% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $17.11 $0.00 $17.11 -26% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND STRUCTURAL $32.10 $17.38 $49.48 Bottom 10% +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $9.31 $0.00 $9.31 -52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $12.00 $0.00 $12.00 -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $13.00 $1.91 $14.91 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $12.39 $0.00 $12.39 -36% vs market $0.00 $0.00 $0.00 $0.00
LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER $35.40 $19.05 $54.45 Top 10% $0.00 $0.00 $0.00 $0.00
LESS THAN 200 TON CAPACITY $36.14 $19.05 $55.19 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $21.25 $4.35 $25.60 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $20.64 $2.35 $22.99 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $14.28 $1.70 $15.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $16.18 $0.00 $16.18 $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $41.00 $16.03 $57.03 +116% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.00 $16.03 $57.03 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 10 OILER; SEMI- TRAILER TRUCK DRIVER $27.25 $19.05 $46.30 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER $34.07 $19.05 $53.12 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 FORKLIFT $28.77 $19.05 $47.82 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $26.30 $10.34 $36.64 +62% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $33.38 $16.36 $49.74 +61% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.82 0.00 PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $12.91 $0.00 $12.91 -58% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP AND FLATBED TRUCK $11.60 $0.00 $11.60 Top 10% -54% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Comanche, OK — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Comanche

Compliance Notes

Full Davis-Bacon compliance guide →