Building Construction — Yates, New York

WD NY20260073-16114-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BOILERMAKER in Yates, New York (construction type: building) is $39.35/hr base + $33.18/hr fringe = $72.53/hr total package (WD NY20260073-16114-bld, Rev. 2).

Scroll down for all 32 trade classifications covered by this determination.

WD Number: NY20260073-16114-bld
Revision: 2
Construction Type: building
State: New York (NY)
County: Yates
Effective: May 17, 2026
Trades covered: 32
Official source: SAM.gov reference NY20260073View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BOILERMAKER $39.35 $33.18 $72.53 +101% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $35.81 $27.65 $63.46 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $32.64 $21.97 $54.61 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $20.32 $8.84 $29.16 -4% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $45.00 $31.12 $76.12 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $61.52 $38.44 $99.96 Above median +67% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $31.05 $31.55 $62.60 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - PIPE & PIPEWRAPPER $27.72 $9.00 $36.72 +20% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER-FENCE ERECTOR $35.75 $30.80 $66.55 Top 10% +45% vs market $0.00 $0.00 $0.00 $0.00
LABORER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOY $29.07 $21.49 $50.56 +82% vs market $0.00 $0.00 $0.00 $0.00
LABORER LANDSCALE FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED $26.22 $21.49 $47.71 +72% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $18.70 $8.28 $26.98 -3% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER $20.89 $8.95 $29.84 Top 10% +8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $21.06 $14.30 $35.36 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: AUGER $21.19 $15.85 $37.04 $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $23.59 $9.95 $33.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $24.15 $17.01 $41.16 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH & ROLLER $27.00 $26.00 $53.00 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $27.60 $26.00 $53.60 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $42.68 $27.88 $70.56 +87% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $27.15 $12.47 $39.62 +5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE TRACTOR MOUNTED, RUBBER TIRED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY $42.34 $35.20 $77.54 +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER; CRANE OILER; LOADER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA $42.34 $35.20 $77.54 +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER; CONCRETE PUMP, TRUCK MOUNTED; CRANE; DRILL; EXCAVATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, I $42.34 $35.20 $77.54 +101% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: EXCEPT TRACTOR-MOUNTED, RUBBER TIRED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY $43.14 $35.20 $78.34 +103% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT FACTORY RATED 15 FEET & OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY $42.34 $35.20 $77.54 +101% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, INCLUDES ROOF TEAR OFF, AND INSTALLATION OF MODIFIED BITUMEN, RUBBER, SHAKE & SHINGLE, AND SINGLE PLY ROOFS $34.10 $28.20 $62.30 +105% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.06 $30.71 $75.77 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $31.06 $22.92 $53.98 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $24.02 $0.00 $24.02 -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.00 $2.62 $18.62 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRE $42.34 $35.20 $77.54 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Yates, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Yates

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260073-16114-bld →