Residential Construction — Orange, New York
WD NY20260049-16102-res · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER, CEMENT MASON, PLASTERER in Orange, New York (construction type: residential) is $43.04/hr base + $34.99/hr fringe = $78.03/hr total package (WD NY20260049-16102-res, Rev. 2).
Scroll down for all 20 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER, CEMENT MASON, PLASTERER | $43.04 | $34.99 | $78.03 +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER, CEMENT MASON, PLASTERER | $45.50 | $36.89 | $82.39 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER & SOFT FLOOR LAYER | $29.10 | $20.36 | $49.46 Top 10% +62% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $51.50 | $42.22 | $93.72 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA | $76.12 | $38.98 | $115.10 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER | $46.62 | $49.30 | $95.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER | $46.62 | $49.30 | $95.92 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 CUSTODIAL WORK, TOOL ROOM TENDER, TEMPORARY HEAT TENDER, PORTABLE PUMP TENDER, TEMPORARY LIGHT TENDER, PORTABLE GENERATOR TENDER, FL | $26.25 | $15.30 | $41.55 +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 ASBESTOS, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND RELATED WORK | $31.25 | $15.30 | $46.55 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $48.75 | $35.63 | $84.38 Top 10% +213% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $36.94 | $24.66 | $61.60 Above median +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $35.94 | $24.66 | $60.60 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER AND STEAMFITTER | $53.20 | $46.57 | $99.77 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 1 GRADERS NOTES: HAZMAT PREMIUM .20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, JULY | $50.57 | $30.30 | $80.87 +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 2 PAVERS NOTES: HAZMAT PREMIUM .20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, JULY 4 | $48.98 | $30.30 | $79.28 +105% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: GROUP 3 BULLDOZERS, ROLLERS NOTES: HAZMAT PREMIUM .20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTE: A. NEW YEAR'S DAY, MEMORIA | $47.07 | $30.30 | $77.37 +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $50.25 | $32.62 | $82.87 Top 10% +172% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $15.54 | $6.92 | $22.46 -36% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTERS | $57.20 | $32.66 | $89.86 +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $17.00 | $4.46 | $21.46 Above median -26% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Orange, NY — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Orange, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.