Heavy Construction — Orange, New York
WD NY20260007-16102-hvy · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY in Orange, New York (construction type: heavy) is $61.80/hr base + $33.55/hr fringe = $95.35/hr total package (WD NY20260007-16102-hvy, Rev. 2).
Scroll down for all 128 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $61.80 | $33.55 | $95.35 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 200': ADD $2.00 BUILDING CONSTRUCTION NORTHERN PART OF DUTCHESS | $55.42 | $33.20 | $88.62 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRIST | $56.59 | $37.50 | $94.09 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL, MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, A | $54.93 | $33.20 | $88.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ARTICULATED WATER TRUCKS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION | $37.91 | $46.37 | $84.28 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THAN | $68.88 | $49.83 | $118.71 Top 10% +229% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (DUTCHESS, ORANGE AND ULSTER COUNTIES).$ 46.45 37.50 BRICKLAYERS, CEMENT MASO | $47.44 | $38.00 | $85.44 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HEAVY CONSTRUCTION (ORANGE COUNTY) | $47.44 | $38.00 | $85.44 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS, HIGHWAY CONSTRUCTION (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES) | $46.45 | $37.50 | $83.95 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS:: CARPENTERS, MILLWRIGHTS, PILE DRIVERS | $44.72 | $31.23 | $75.95 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY | $61.72 | $37.50 | $99.22 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER | $75.46 | $55.84 | $131.30 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DIVER TENDER | $55.00 | $55.84 | $110.84 Top 10% +50% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 | $116.43 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| DUTCHESS) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY | $60.30 | $33.55 | $93.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DUTCHESS, ULSTER AND SULLIVAN COUNTIES). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR | $51.50 | $42.22 | $93.72 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ORANGE AND DUTCHESS COUNTIES). FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRES | $51.50 | $42.22 | $93.72 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO | $40.81 | $6.99 | $47.80 Top 10% +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA | $20.53 | $6.39 | $26.92 Top 10% -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE | $38.73 | $6.93 | $45.66 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING S | $49.25 | $31.15 | $80.40 +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING S | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING S | $55.40 | $31.78 | $87.18 Above median +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING S | $35.34 | $30.12 | $65.46 Bottom 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $43.35 | $30.73 | $74.08 +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $54.19 | $35.69 | $89.88 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $48.77 | $31.31 | $80.08 Above median +115% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFF | $32.51 | $29.93 | $62.44 Bottom 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER | $63.14 | $33.82 | $96.96 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid | $64.59 | $42.92 | $107.51 Top 10% +189% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga | $35.34 | $30.12 | $65.46 Top 10% +76% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t | $55.40 | $31.78 | $87.18 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un | $61.56 | $36.21 | $97.77 Top 10% +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g | $49.25 | $31.15 | $80.40 Top 10% +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA | $76.12 | $38.98 | $115.10 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $49.20 | $57.20 | $106.40 Top 10% +269% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION | $41.74 | $27.58 | $69.32 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION M | $46.62 | $49.30 | $95.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER | $41.74 | $27.58 | $69.32 Above median +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| INSULATOR/ASBESTOS WORKER | $46.62 | $49.30 | $95.92 Top 10% +214% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $42.63 | $53.70 | $96.33 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DUTCHESS COUNTY: GROUP 1 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump ten | $45.40 | $29.75 | $75.15 Top 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: DUTCHESS COUNTY: GROUP 2 LABORERS BUILDING CLASSIFICATIONS GROUP 1: Custodial work, flag person, portable generator tender, portable pump ten | $46.20 | $29.75 | $75.95 Top 10% +174% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 1 MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS | $41.10 | $32.90 | $74.00 Top 10% +167% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 2 | $42.22 | $32.90 | $75.12 Bottom 10% +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: GROUP 3 BLASTERS, LASER BEAM OPERATOR | $43.45 | $32.90 | $76.35 Top 10% +175% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK | $36.45 | $27.80 | $64.25 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDER | $42.80 | $27.80 | $70.60 Top 10% +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS, LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. FOOTNOTE: A. PAID HO | $43.90 | $27.80 | $71.70 Top 10% +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MACHINE, HEATER PLANER; HOISTS:. LONG BOOM RATE TO BE APPLIED IF HOIST IS ""OUTSIDE MATERIAL LOWER HOIST""; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-A | $60.13 | $37.50 | $97.63 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MACHINES; CONCRETE SAWS AND CUTTERS; CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING M | $58.22 | $37.50 | $95.72 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $47.83 | $43.03 | $90.86 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OF DUTCHESS BUILDING CONSTRUCTION) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE | $53.91 | $33.20 | $87.11 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: STRUCTURAL STEEL AND BRIDGE | $56.25 | $55.14 | $111.39 Top 10% +314% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $36.94 | $24.66 | $61.60 Above median +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS | $35.94 | $24.66 | $60.60 Above median +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER | $60.66 | $45.35 | $106.01 Top 10% +181% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER; STEAMFITTER | $53.20 | $46.57 | $99.77 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER; STEAMFITTER (SULLIVAN COUNTY; ORANGE COUNTY AND ULSTER COUNTY) | $53.20 | $46.57 | $99.77 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR BUILDING, HEAVY & HIGHWAY GROUP 1 | $61.72 | $37.50 | $99.22 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 | $57.30 | $33.55 | $90.85 Above median +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $59.04 | $31.32 | $90.36 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $54.41 | $31.32 | $85.73 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 ASPHALT PAVER, BACKHOE, BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT, BLAST OR ROTARY D | $56.39 | $33.55 | $89.94 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $56.97 | $31.32 | $88.29 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE, BALL | $53.82 | $33.55 | $87.37 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $54.88 | $31.32 | $86.20 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $52.25 | $31.32 | $83.57 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 TOWER CRANES (NORTHERN PART OF DUTCHESS) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY | $63.30 | $33.55 | $96.85 Top 10% +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $54.33 | $31.32 | $85.65 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $45.94 | $31.32 | $77.26 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $49.53 | $31.32 | $80.85 Top 10% +110% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $61.95 | $31.32 | $93.27 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $47.00 | $31.32 | $78.32 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY BUILDING CONSTRUCTION) | $49.26 | $31.32 | $80.58 Top 10% +109% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 7 MASTER MECHANIC (NORTHERN PART OF DUTCHESS) FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE D | $58.91 | $33.55 | $92.46 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 1-B ROAD PAVER, ASPHALT NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR | $63.70 | $35.25 | $98.95 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC ALL TYPES NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR R | $59.67 | $35.25 | $94.92 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-1 MASTER MECHANIC NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RA | $64.02 | $35.25 | $99.27 Top 10% +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER | $77.82 | $35.25 | $113.07 Top 10% +193% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-3 ENGINEER-- PILE DRIVER NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REG | $75.13 | $35.25 | $110.38 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER; POST HOLE DIGGER NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS | $59.19 | $35.25 | $94.44 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 1 CRANES; DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB | $70.24 | $37.50 | $107.74 Top 10% +179% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 2 CRANES; DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB | $68.58 | $37.50 | $106.08 Top 10% +175% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM | $61.29 | $37.50 | $98.79 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOU | $58.63 | $37.50 | $96.13 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERT | $57.10 | $37.50 | $94.60 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 6 OILER NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75 FOO | $53.34 | $37.50 | $90.84 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION STEEL ERECTION GROUP 7 HELICOPTER PILOT . NOTES: Hydrographic Premium 50 Hazmat Premium 20% Tunnel Pr | $65.74 | $37.50 | $103.24 Top 10% +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 | $69.96 | $37.50 | $107.46 Top 10% +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOM | $68.37 | $37.50 | $105.87 Top 10% +174% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 3: HELICOPTER PILOT ENGINEER. (ORANGE, ULSTER AND SULLIVAN COUNTIES NOTES: Tunnel | $64.85 | $37.50 | $102.35 Top 10% +165% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED A | $61.28 | $37.50 | $98.78 Top 10% +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: BUILDING CONSTRUCTION TANK ERECTION GROUP 5: OILER NOTES: Tunnel Premium .75 Hazmat Premium 20% Hydrographic Premium .50 FO | $54.07 | $37.50 | $91.57 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR; DOPE POTS; DUST COLLECTORS; PUMPS; PUMPS; PUMPS, DI | $57.06 | $37.50 | $94.56 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM | $64.28 | $37.50 | $101.78 Top 10% +164% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS: OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUPGROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAI | $53.34 | $37.50 | $90.84 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATORS:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR | $51.01 | $33.20 | $84.21 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY | $58.56 | $37.50 | $96.06 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY | $60.70 | $37.50 | $98.20 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY | $62.35 | $37.50 | $99.85 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR; COMPRESSOR TRUCK MOUNTED NOTES: LOADER OPERATOR .50 SHOVAL OPERATORS 1.00 HAZMAT PREMIUM OVER REGULAR RAT | $44.19 | $35.25 | $79.44 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| REFRIGERATION MECHANIC | $41.99 | $37.38 | $79.37 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $50.25 | $32.62 | $82.87 Top 10% +172% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $55.29 | $47.43 | $102.72 Top 10% +191% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $57.20 | $32.66 | $89.86 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A. PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, L | $63.54 | $37.50 | $101.04 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY | $64.02 | $35.25 | $99.27 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY | $60.42 | $35.25 | $95.67 | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PR | $39.03 | $46.37 | $85.40 Top 10% +193% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE | $37.35 | $46.37 | $83.72 Top 10% +188% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FU | $37.13 | $46.37 | $83.50 Top 10% +187% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDE | $37.02 | $46.37 | $83.39 Top 10% +187% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS. FOOTN | $36.90 | $46.37 | $83.27 Top 10% +186% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $70.41 | $35.25 | $105.66 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $51.57 | $35.25 | $86.82 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $56.81 | $35.25 | $92.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $57.84 | $35.25 | $93.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVIN | $68.63 | $35.25 | $103.88 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Orange, NY — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Orange
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Orange, New York.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.