Highway Construction — Niagara, New York

WD NY20260011-16082-hwy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AND SHAFT), HOIST, MAINTENANCE ENGINEER, MINING MACHINE, MOTOR MAN, MUCKING MACHINE, SHOVEL, TRIPPER/MAINTENANCE ENGINEER, TUNNEL SHOVEL NOTES: HAZMAT in Niagara, New York (construction type: highway) is $39.29/hr base + $28.10/hr fringe = $67.39/hr total package (WD NY20260011-16082-hwy, Rev. 2).

Scroll down for all 66 trade classifications covered by this determination.

WD Number: NY20260011-16082-hwy
Revision: 2
Construction Type: highway
State: New York (NY)
County: Niagara
Effective: May 17, 2026
Trades covered: 66
Official source: SAM.gov reference NY20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND SHAFT), HOIST, MAINTENANCE ENGINEER, MINING MACHINE, MOTOR MAN, MUCKING MACHINE, SHOVEL, TRIPPER/MAINTENANCE ENGINEER, TUNNEL SHOVEL NOTES: HAZMAT $39.29 $28.10 $67.39 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $39.35 $33.18 $72.53 +101% vs market $0.00 $0.00 $0.00 $0.00
BOOM AND JIB 100-199 FT CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT $47.39 $34.84 $82.23 $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $37.44 $32.71 $70.15 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $41.19 $29.81 $71.00 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: PILEDRIVER $41.19 $31.55 $72.74 Top 10% $0.00 $0.00 $0.00 $0.00
CEMENT FINISHER $33.55 $34.17 $67.72 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLU $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRID $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TR $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATIO $40.81 $6.99 $47.80 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DA $20.53 $6.39 $26.92 Top 10% -28% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NE $38.73 $6.93 $45.66 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $42.29 $30.66 $72.95 +96% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $52.86 $35.60 $88.46 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $47.57 $31.03 $78.60 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONIT $31.72 $29.87 $61.59 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER $63.14 $33.82 $96.96 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid $64.59 $42.92 $107.51 Top 10% +189% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or ga $35.34 $30.12 $65.46 Top 10% +76% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail t $55.40 $31.78 $87.18 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type undergro $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type un $61.56 $36.21 $97.77 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or g $49.25 $31.15 $80.40 Top 10% +116% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $44.20 $32.90 $77.10 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
FRONT END LOADER, GRAYCO EPOXY MACHINE, HOIST, MAINTENANCE ENGINEER, MAINTENANCE GREASE MAN, PERSONNEL HOIST, PUMP CRETE, SHOTCRETE MACHINE, SHOVEL NO $34.58 $28.10 $62.68 $0.00 $0.00 $0.00 $0.00
GLAZIER $34.68 $27.64 $62.32 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
HOISTS MOUNTED ON TRUCKS, TRACTORS, TRENCHERS EXCAVATING UP TO 6 FT DEEP), TRENCHERS ON THE BACK OF A JEEP, WELDING MACHINES, WINCH TRACTORS NOTES: HA $42.89 $34.84 $77.73 $0.00 $0.00 $0.00 $0.00
IRONWORKER $36.25 $33.12 $69.37 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS $36.25 $33.12 $69.37 Bottom 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER COMPRESSED AIR GROUP 1 TOP LABORERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHR $26.00 $35.96 $61.96 +123% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 1 COMMON LABORERS, MULTI-TRADE TENDER, DECONTAMINATION OF ALL MACHINES, HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES WITH $26.00 $35.96 $61.96 +123% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 3 RESPIRATOR REQUIRED FOR BUSTING FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY $26.50 $35.96 $62.46 +125% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 4 FORM SETTER; ROAD FINISHER; GUNNITE NOZZLEMAN; SANDBLASTERS; BURNING TORCH; CONCRETE SAW OPERATORS; UTILITY PILE DRIVER; TREE TOPPER $26.60 $35.96 $62.56 +126% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 5 LASER BEAM OPERATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS D $26.85 $35.96 $62.81 +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 6 WELDERS; WAGON DRILL & AIR TRACK DRILL; SELF CONTAINED DRILL; RESPIRATOR REQUIRED DUE TO ATMOSPHERIC CONDITIONS FOOTNOTE: A. PAID HOLI $27.00 $35.96 $62.96 +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 7 CHEMICAL WASTE - MEN WORKING WITH HAZARDOUS WASTE & TOXIC MATERIALS OR IN AREAS OF RADIOACTIVE MATERIAL & ASBESTOS; THE REMOVAL OF ASB $28.00 $35.96 $63.96 +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 8 GRADE CHECKER & BLASTER FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTM $28.60 $35.96 $64.56 +133% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 9 SUPPLIED AIR RESPIRATORS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRIST $31.00 $35.96 $66.96 +141% vs market $0.00 $0.00 $0.00 $0.00
LONG BOOM CRANE PREMIUM 200 FT - 299 FT ADD $2.00 TO GGROUP A - LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; ME $38.06 $28.10 $66.16 $0.00 $0.00 $0.00 $0.00
LONG BOOM CRANE PREMIUM 300 FT AND OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRIS $28.53 $28.10 $56.63 $0.00 $0.00 $0.00 $0.00
MARBLE MASON $36.85 $30.80 $67.65 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY $26.30 $35.96 $62.26 $0.00 $0.00 $0.00 $0.00
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: BRUSH & ROLLER $33.00 $28.21 $61.21 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: DRYWALL/TAPING $34.00 $28.51 $62.51 +132% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: HEAVY & HIGHWAY CONSTRUCTION: WALLCOVERING $33.00 $28.21 $61.21 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: PAINTERS $33.00 $28.21 $61.21 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAYING, PAPERHANGERS, SAND-BLASTING, SWINGING SCAFFOLD $33.00 $28.21 $61.21 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: TAPERS $34.00 $28.51 $62.51 +132% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $42.20 $29.80 $72.00 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
POINTER, CLEANER AND CAULKER $36.82 $31.33 $68.15 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR MASTER MECHANIC NOTES: HAZMAT PREMIUM 3.00 ZONE PAY: ADD $1.00 TO GROUP A - LONG BOOM CRANE PREMIUM 100 FT - 199 FT ADD $1.50 $48.46 $34.84 $83.30 +116% vs market $0.00 $0.00 $0.00 $0.00
PREMIUM FOR BOOM AND JIB 100-199 FT CRANE BOOM PREMIUM FOR BOOM AND JIB 100-199 FT $47.39 $34.84 $82.23 $0.00 $0.00 $0.00 $0.00
ROOFERS: COMPOSITION $34.96 $26.03 $60.99 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS: SLATE & TILE $35.11 $26.03 $61.14 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $29.18 $68.68 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $47.85 $28.94 $76.79 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO WORKER $37.85 $31.80 $69.65 $0.00 $0.00 $0.00 $0.00
TILE, MARBLE & TERRAZZO FINISHER $34.71 $17.54 $52.25 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: DUMP TRUCK ONLY, EXCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPEN $32.00 $0.00 $32.00 +10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: INCLUDES SINGLE AXLE DUMP AND OFF-HIGHWAY DUMP TRUCKS WORK ON A HAZARDOUS WASTE SITE THEN ADDITIONAL $2.00 PER HOUR. FOOTNOTE: A. PENSI $49.23 $8.75 $57.98 +99% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Niagara, NY — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Niagara

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260011-16082-hwy →