Building Construction — Niagara, New York

WD NY20260019-16082-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Niagara, New York (construction type: building) is $37.65/hr base + $30.69/hr fringe = $68.34/hr total package (WD NY20260019-16082-bld, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: NY20260019-16082-bld
Revision: 1
Construction Type: building
State: New York (NY)
County: Niagara
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference NY20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $37.65 $30.69 $68.34 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER, STONEMASON $37.44 $32.71 $70.15 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $34.26 $25.94 $60.20 +97% vs market $0.00 $0.00 $0.00 $0.00
CEMENT FINISHER $33.55 $34.17 $67.72 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $44.20 $32.90 $77.10 Above median +107% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RA $62.39 $38.44 $100.83 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $34.68 $27.64 $62.32 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS MATERIAL HANDLER $34.15 $26.09 $60.24 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $36.25 $33.12 $69.37 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS $36.25 $33.12 $69.37 Bottom 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 1 COMMON LABORERS, DECONTAMINATION OF ALL MACHINES; HORIZONTAL DIRECTIONAL DRILL/LOCATOR; ALL TERRAIN VEHICLES WITH ATTACHMENTS/ALL WH $32.45 $41.36 $73.81 +166% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 2 BLASTERS, GRADE CHECKER; 10% OF BASE RATE FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY $35.70 $41.36 $77.06 +178% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 3 WAGON DRILL-AIRTRACK, SELF-CONTAINED DRILL FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY $33.45 $41.36 $74.81 +170% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 4 LASER BEAM OPERATOR FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY $33.30 $41.36 $74.66 +169% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 5 ROAD FINISHER, FORM SETTER, GUNNITE NOZZLEMAN, SANDBLASTERS, BURNING TORCH, CONCRETE SAW OPERATORS, GROUT MACHINE AND GROUT PUMPS OP $33.05 $41.36 $74.41 +168% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 6 VIDEO MACHINE OPERATOR IN INSPECTION OF PIPE FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY $32.95 $41.36 $74.31 +168% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 7 POTMAN, PIPELAYERS, PAVEMENT BREAKERS OR BUSTERS, JACKHAMMER OPERATORS; BARCO RAMMERS; CHAIN SAW; POWDER MONKEY; BLACK TOP RAKERS; S $32.75 $41.36 $74.11 +167% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 8 THE HANDLING, LOADING, UNLOADING, STACKING, DISTRIBUTION, ERECTION AND DISMANTLING OF ANY AND ALL TYPES OF SCAFFOLDING AND/OR WORK P $34.45 $41.36 $75.81 +173% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: GROUP 9 USE OF SUPPLIED AIR RESPIRATORS FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY $37.45 $41.36 $78.81 +184% vs market $0.00 $0.00 $0.00 $0.00
MARBLE MASON $36.85 $30.80 $67.65 $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH & ROLLER $33.00 $28.21 $61.21 Above median +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: DRYWALL/TAPING $34.00 $28.51 $62.51 +132% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: PAINTERS $33.00 $28.21 $61.21 +127% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: TAPERS/DRY WALL $34.00 $28.51 $62.51 +132% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $30.15 $20.49 $50.64 Above median +42% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER AND STEAMFITTER $42.20 $29.80 $72.00 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
POINTER, CLEANER AND CAULKER $36.82 $31.33 $68.15 Bottom 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A1 BACKHOE OPERATORS $44.23 $35.40 $79.63 +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A1 BULLDOZER $44.23 $35.40 $79.63 +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A1 FORKLIFT OPERATOR/LULL $44.23 $35.40 $79.63 +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A1 LOADER $44.23 $35.40 $79.63 +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP A1 ROLLER $44.23 $35.40 $79.63 +106% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS: COMPOSITION $34.96 $26.03 $60.99 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS: SLATE & TILE $35.11 $26.03 $61.14 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $39.50 $29.18 $68.68 Above median +94% vs market $0.00 $0.00 $0.00 $0.00
TILE & TERRAZZO WORKER $37.85 $31.80 $69.65 $0.00 $0.00 $0.00 $0.00
TILE, MARBLE & TERRAZZO FINISHER $34.71 $17.54 $52.25 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Niagara, NY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Niagara

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NY20260019-16082-bld →