Highway Construction — Torrance, New Mexico

WD NM20260033-16065-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDING FORM WORK in Torrance, New Mexico (construction type: highway) is $13.70/hr base + $0.44/hr fringe = $14.14/hr total package (WD NM20260033-16065-hwy, Rev. 1).

Scroll down for all 21 trade classifications covered by this determination.

WD Number: NM20260033-16065-hwy
Revision: 1
Construction Type: highway
State: New Mexico (NM)
County: Torrance
Effective: May 17, 2026
Trades covered: 21
Official source: SAM.gov reference NM20260033View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDING FORM WORK $13.70 $0.44 $14.14 Bottom 10% -43% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING FORM WORK $13.73 $0.44 $14.17 -43% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.58 $0.26 $15.84 -32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.35 $0.26 $15.61 -33% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.91 $9.45 $35.36 +29% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.61 $6.03 $28.64 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
LABORER (TRAFFIC CONTROL) $14.27 $0.35 $14.62 Top 10% -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.85 $0.35 $12.20 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.82 $0.35 $12.17 Top 10% -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.22 $0.26 $15.48 -34% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $20.10 $0.26 $20.36 -14% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.67 $1.57 $18.24 -23% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $20.92 $3.62 $24.54 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER $14.91 $0.26 $15.17 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER $14.73 $0.26 $14.99 Bottom 10% -37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $16.59 $0.26 $16.85 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $16.78 $0.26 $17.04 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $22.08 $8.72 $30.80 +30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.51 $0.26 $14.77 -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $14.46 $0.26 $14.72 -37% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $13.51 $1.51 $15.02 -35% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Torrance, NM — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Torrance

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NM20260033-16065-hwy →