Building Construction — Torrance, New Mexico

WD NM20260049-16065-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Torrance, New Mexico (construction type: building) is $36.66/hr base + $11.83/hr fringe = $48.49/hr total package (WD NM20260049-16065-bld, Rev. 1).

Scroll down for all 17 trade classifications covered by this determination.

WD Number: NM20260049-16065-bld
Revision: 1
Construction Type: building
State: New Mexico (NM)
County: Torrance
Effective: May 17, 2026
Trades covered: 17
Official source: SAM.gov reference NM20260049View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $36.66 $11.83 $48.49 +136% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $21.38 $9.12 $30.50 +22% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER (INCLUDES DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND METAL STUD INSTALLATION) $24.08 $10.79 $34.87 +39% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.40 $7.45 $25.85 +10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.30 $13.41 $53.71 +96% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $20.15 $3.48 $23.63 +7% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $28.05 $18.11 $46.16 Above median +26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.99 $4.72 $20.71 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $14.72 $5.61 $20.33 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $27.97 $5.16 $33.13 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $16.60 $3.88 $20.48 -7% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $16.51 $2.14 $18.65 -15% vs market $0.00 $0.00 $0.00 $0.00
PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE $53.35 $38.44 $91.79 $0.00 $0.00 $0.00 $0.00
PIPEFITTER $43.07 $16.60 $59.67 +108% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.07 $16.60 $59.67 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.50 $18.51 $56.01 +97% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $39.94 $25.48 $65.42 +128% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Torrance, NM — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Torrance

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NM20260049-16065-bld →