Highway Construction — Taos, New Mexico

WD NM20260037-16064-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Taos, New Mexico (construction type: highway) is $13.93/hr base + $0.44/hr fringe = $14.37/hr total package (WD NM20260037-16064-hwy, Rev. 1).

Scroll down for all 88 trade classifications covered by this determination.

WD Number: NM20260037-16064-hwy
Revision: 1
Construction Type: highway
State: New Mexico (NM)
County: Taos
Effective: May 17, 2026
Trades covered: 88
Official source: SAM.gov reference NM20260037View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $13.93 $0.44 $14.37 -43% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $14.44 $0.44 $14.88 -40% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $13.51 $0.44 $13.95 -44% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $13.84 $0.44 $14.28 -43% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.58 $1.54 $17.12 -27% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.07 $0.26 $15.33 -35% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.58 $0.26 $15.84 -32% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN.$ 24.66 8.56 CEMENT MASON/CONCRETE FINISHER $14.98 $0.26 $15.24 Top 10% -44% vs market $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER $15.31 $0.35 $15.66 Above median $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER $16.37 $0.26 $16.63 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER $14.55 $0.35 $14.90 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER $15.16 $0.35 $15.51 $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER $13.66 $0.35 $14.01 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER $12.00 $0.35 $12.35 $0.00 $0.00 $0.00 $0.00
INSTALLER $12.37 $0.35 $12.72 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER $11.68 $0.35 $12.03 Bottom 10% $0.00 $0.00 $0.00 $0.00
INSTALLER $12.35 $0.35 $12.70 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.98 $6.03 $28.01 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.44 $5.85 $28.29 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $21.57 $4.80 $26.37 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $23.05 $1.54 $24.59 Above median -33% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $21.77 $6.03 $27.80 -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER $14.67 $1.60 $16.27 -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $10.89 $0.35 $11.24 Above median -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $12.61 $0.35 $12.96 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $12.56 $0.35 $12.91 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $12.28 $0.35 $12.63 Top 10% -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $12.15 $0.35 $12.50 Top 10% -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.34 $0.35 $11.69 Above median -37% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.22 $0.35 $11.57 Above median -38% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $11.57 $0.35 $11.92 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL $12.27 $0.35 $12.62 Top 10% -32% vs market $0.00 $0.00 $0.00 $0.00
LABORER, COMMON OR GENERAL..$ 11.83 0.35 LABORER, COMMON OR GENERAL $9.60 $0.35 $9.95 Top 10% -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER, FLAGGER/CONE SETTER $12.21 $0.26 $12.47 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER, FLAGGER/CONE SETTER $11.66 $0.35 $12.01 Bottom 10% -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER, FLAGGER/CONE SETTER $12.15 $0.99 $13.14 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER, FLAGGER/CONE SETTER $13.14 $0.35 $13.49 Top 10% -27% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE $13.33 $1.97 $15.30 Top 10% -17% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASONTENDER-BRICK/CEMENT/CONCRETE $13.04 $1.78 $14.82 Bottom 10% -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $14.39 $0.35 $14.74 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.99 $0.35 $17.34 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
PAINTER, BRUSH, ROLLER AND SPRAY $14.15 $0.44 $14.59 Bottom 10% -34% vs market $0.00 $0.00 $0.00 $0.00
PAINTER, BRUSH, ROLLER AND SPRAY $15.06 $0.44 $15.50 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.26 $0.26 $16.52 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.89 $0.26 $17.15 -27% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $14.50 $0.26 $14.76 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.53 $0.26 $16.79 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $15.72 $0.26 $15.98 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $16.43 $1.51 $17.94 -24% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.27 $0.26 $16.53 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.70 $0.26 $16.96 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.74 $0.26 $21.00 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.80 $0.26 $17.06 -28% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER $18.06 $0.26 $18.32 -22% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $14.89 $0.26 $15.15 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: BULLDOZER $14.97 $0.26 $15.23 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: FORKLIFT $17.16 $0.26 $17.42 Bottom 10% -26% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $19.50 $0.26 $19.76 -16% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GRADER/BLADE $17.48 $0.26 $17.74 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $19.37 $0.26 $19.63 -17% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $15.72 $0.26 $15.98 -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER $16.27 $0.26 $16.53 -30% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LOADER.$ 16.10 0.26 POWER EQUIPMENT OPERATOR: LOADER.$ 16.21 0.26 POWER EQUIPMENT OPERATOR: LOADER $16.13 $0.26 $16.39 Top 10% -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: MECHANIC $17.48 $0.26 $17.74 -25% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER $14.29 $0.26 $14.55 -38% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PILEDRIVER $15.99 $0.26 $16.25 Top 10% -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PILEDRIVER $14.95 $0.26 $15.21 Bottom 10% -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: PILEDRIVER $15.87 $0.26 $16.13 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $14.74 $0.26 $15.00 -36% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $16.49 $0.26 $16.75 -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROLLER $14.39 $0.98 $15.37 -35% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ROTOMILL $15.80 $0.26 $16.06 Bottom 10% -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCRAPER $15.91 $0.26 $16.17 Above median -32% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: SCREED $15.96 $0.26 $16.22 -31% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: TRACTOR $16.84 $0.26 $17.10 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $14.00 $0.00 $14.00 -40% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $16.58 $0.26 $16.84 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.20 $0.26 $15.46 -34% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.15 $0.26 $13.41 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $13.24 $0.26 $13.50 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK.$ 14.75 0.26 TRUCK DRIVER: DISTRIBUTOR $13.56 $0.26 $13.82 Top 10% -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $12.95 $0.26 $13.21 -43% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $13.30 $0.26 $13.56 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $13.55 $0.26 $13.81 -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $13.27 $0.26 $13.53 -42% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $12.71 $0.26 $12.97 -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP AND PILOT CAR $12.74 $0.26 $13.00 -44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $13.13 $0.26 $13.39 -42% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Taos, NM — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Taos

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NM20260037-16064-hwy →