Building Construction — Taos, New Mexico

WD NM20260031-16064-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ABOVE ZONE 1 RATE in Taos, New Mexico (construction type: building) is $40.30/hr base + $13.41/hr fringe = $53.71/hr total package (WD NM20260031-16064-bld, Rev. 2).

Scroll down for all 41 trade classifications covered by this determination.

WD Number: NM20260031-16064-bld
Revision: 2
Construction Type: building
State: New Mexico (NM)
County: Taos
Effective: May 17, 2026
Trades covered: 41
Official source: SAM.gov reference NM20260031View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ABOVE ZONE 1 RATE $40.30 $13.41 $53.71 Top 10% $0.00 $0.00 $0.00 $0.00
ACOUSTICAL CEILING MECHANIC $12.00 $0.00 $12.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $21.77 $3.98 $25.75 Bottom 10% -16% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $20.80 $5.10 $25.90 +14% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $18.80 $5.61 $24.41 -2% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $26.07 $5.96 $32.03 +28% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, AND FORM WORK $19.27 $4.29 $23.56 Above median -6% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: DRYWALL HANGING ONLY $24.08 $10.79 $34.87 Bottom 10% +39% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: DRYWALL HANGING ONLY $29.09 $16.20 $45.29 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.27 $3.94 $20.21 -14% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $18.34 $4.38 $22.72 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $18.05 $4.49 $22.54 +3% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $20.15 $3.63 $23.78 +8% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $19.75 $8.71 $28.46 Above median -22% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $28.05 $18.11 $46.16 Bottom 10% +26% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $23.69 $7.89 $31.58 Bottom 10% +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $10.25 $0.00 $10.25 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $12.99 $3.56 $16.55 Above median -11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE & IRRIGATION $12.42 $1.47 $13.89 Top 10% -25% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $11.51 $0.85 $12.36 -33% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $13.78 $2.20 $15.98 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $18.79 $3.47 $22.26 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.38 $4.60 $28.98 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $20.86 $4.60 $25.46 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $20.33 $4.94 $25.27 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER, EXCLUDES DRYWALL FINISHING/TAPING $24.00 $7.00 $31.00 Top 10% +40% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY.$ 15.47 2.09 OPERATOR: LOADER $19.76 $4.84 $24.60 Top 10% +11% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $43.07 $16.60 $59.67 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $17.65 $5.29 $22.94 Bottom 10% +1% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $43.07 $16.60 $59.67 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( BOBCAT/SKID LOADER) $27.70 $4.65 $32.35 Top 10% +37% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR ( ROLLER) $26.75 $4.65 $31.40 Top 10% +33% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $18.84 $0.00 $18.84 -12% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $37.50 $18.51 $56.01 +97% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION $22.01 $9.65 $31.66 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $20.00 $4.16 $24.16 -16% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $14.02 $0.00 $14.02 -25% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $14.30 $1.02 $15.32 -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $11.00 $0.00 $11.00 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: PICKUP TRUCK $15.91 $3.13 $19.04 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $15.16 $4.69 $19.85 Above median -15% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Taos, NM — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Taos

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NM20260031-16064-bld →