Residential Construction — Dona Ana, New Mexico

WD NM20260003-14857-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Dona Ana, New Mexico (construction type: residential) is $11.60/hr base + $0.30/hr fringe = $11.90/hr total package (WD NM20260003-14857-res, Rev. 1).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: NM20260003-14857-res
Revision: 1
Construction Type: residential
State: New Mexico (NM)
County: Dona Ana
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference NM20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $11.60 $0.30 $11.90 Bottom 10% -52% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $11.44 $0.30 $11.74 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $9.79 $0.00 $9.79 Bottom 10% -58% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $14.88 $0.00 $14.88 -48% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $12.67 $0.00 $12.67 -50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $13.52 $1.93 $15.45 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR $13.38 $0.00 $13.38 Top 10% -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER $8.62 $0.00 $8.62 Bottom 10% -53% vs market $0.00 $0.00 $0.00 $0.00
LABORER $8.59 $0.00 $8.59 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
LABORER $7.25 $0.00 $7.25 Bottom 10% -61% vs market $0.00 $0.00 $0.00 $0.00
LABORER $8.00 $0.28 $8.28 Bottom 10% -55% vs market $0.00 $0.00 $0.00 $0.00
LATHER $10.00 $0.00 $10.00 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAINTER $9.03 $0.00 $9.03 -59% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $22.84 $7.33 $30.17 +5% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $12.59 $0.00 $12.59 -47% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $9.83 $0.00 $9.83 Bottom 10% -54% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $10.81 $0.00 $10.81 Bottom 10% -62% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $9.00 $0.00 $9.00 -61% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $10.00 $0.00 $10.00 -57% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dona Ana, NM — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dona Ana

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NM20260003-14857-res →