Heavy Construction — Dona Ana, New Mexico

WD NM20260039-14857-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Dona Ana, New Mexico (construction type: heavy) is $27.31/hr base + $13.18/hr fringe = $40.49/hr total package (WD NM20260039-14857-hvy, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: NM20260039-14857-hvy
Revision: 1
Construction Type: heavy
State: New Mexico (NM)
County: Dona Ana
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference NM20260039View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $27.31 $13.18 $40.49 +62% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $16.43 $0.00 $16.43 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.44 $8.08 $27.52 +18% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $34.50 $10.81 $45.31 +66% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $27.80 $0.00 $27.80 Above median -24% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $15.68 $0.35 $16.03 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.67 $3.04 $19.71 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.85 $4.19 $25.04 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $21.06 $0.00 $21.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.00 $0.00 $21.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $19.02 $0.00 $19.02 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $18.30 $0.00 $18.30 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $18.23 $0.00 $18.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $18.83 $0.00 $18.83 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $15.53 $0.00 $15.53 -33% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dona Ana, NM — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dona Ana

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NM20260039-14857-hvy →