WD NJ20260061-16036-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER DOCK BUILDER (All other Work on land pile driving, floating marine construction and the construction of wharves, while handling and working in Passaic, New Jersey (construction type: heavy) is $52.98/hr base + $52.44/hr fringe = $105.42/hr total package (WD NJ20260061-16036-hvy, Rev. 1).

Scroll down for all 24 trade classifications covered by this determination.

WD Number: NJ20260061-16036-hvy
Revision: 1
Construction Type: heavy
State: New Jersey (NJ)
County: Passaic
Effective: May 17, 2026
Trades covered: 24
Official source: SAM.gov reference NJ20260061View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER DOCK BUILDER (All other Work on land pile driving, floating marine construction and the construction of wharves, while handling and working $52.98 $52.44 $105.42 +254% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER DOCK BUILDER (Concrete form Work on land pile driving, floating marine construction and the construction of wharves, while handling and work $52.02 $39.23 $91.25 +207% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER $57.42 $34.17 $91.59 +208% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $49.60 $37.96 $87.56 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS $65.43 $42.86 $108.29 +208% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS $71.97 $46.42 $118.39 +237% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $49.94 $50.32 $100.26 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $52.24 $50.32 $102.56 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $28.65 $8.52 $37.17 Top 10% +22% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE LABORER, POWER TOOL OPERATOR HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE $50.95 $38.53 $89.48 +195% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: CEMENT/CONCRETE $29.35 $23.07 $52.42 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $24.05 $13.67 $37.72 Above median +24% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other $58.84 $35.06 $93.90 Top 10% +175% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $29.05 $18.91 $47.96 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: BRUSH AND ROLLER $40.19 $22.72 $62.91 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: WORK ON BRIDGES $58.28 $33.85 $92.13 Bottom 10% +218% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE; DRILL; ELEVATING GRADER; EXCAVATOR; FRONT E $61.72 $37.50 $99.22 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE; HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER; S $60.13 $37.50 $97.63 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR; CRUSHER; FORKLIFT; FRONT END LOADER; LULL; MECHANIC; PAVER, ASPHALT; ROLLE $58.22 $37.50 $95.72 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 4 BROOM; COMPRESSOR; FARM TRACTOR; FRONT END LOADER; ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STAT $56.59 $37.50 $94.09 +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: GROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER $52.88 $37.50 $90.38 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK; FLATBED TRUCK HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER I $47.36 $44.02 $91.38 +194% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK; PICKUP TRUCK HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE W $47.51 $44.02 $91.53 +194% vs market $0.00 $0.00 $0.00 $0.00
Work on high stacks: 22% per hour additional $49.60 $37.96 $87.56 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Passaic, NJ — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Passaic

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NJ20260061-16036-hvy →