Building Construction — Passaic, New Jersey

WD NJ20260040-16036-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYP in Passaic, New Jersey (construction type: building) is $51.74/hr base + $46.20/hr fringe = $97.94/hr total package (WD NJ20260040-16036-bld, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: NJ20260040-16036-bld
Revision: 1
Construction Type: building
State: New Jersey (NJ)
County: Passaic
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference NJ20260040View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYP $51.74 $46.20 $97.94 +265% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION $57.42 $34.17 $91.59 +208% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $49.60 $37.96 $87.56 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $44.87 $30.15 $75.02 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $40.21 $11.22 $51.43 -21% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE REMOVAL WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, A $47.36 $44.02 $91.38 $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE REMOVAL WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, A $47.51 $44.02 $91.53 $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $49.94 $50.32 $100.26 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: STRUCTURAL AND ORNAMENTAL $52.24 $50.32 $102.56 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, POWER TOOL OPERATOR AND SCREEDMAN $35.75 $30.22 $65.97 +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: BRICK/CEMENT/CONCRETE $36.50 $30.22 $66.72 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $38.85 $0.14 $38.99 Top 10% +28% vs market $0.00 $0.00 $0.00 $0.00
MARBLE SETTER $64.66 $40.97 $105.63 Top 10% $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $52.88 $37.50 $90.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $56.59 $37.50 $94.09 $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $58.22 $37.50 $95.72 Above median $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $60.13 $37.50 $97.63 Above median $0.00 $0.00 $0.00 $0.00
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, TH $61.72 $37.50 $99.22 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $45.55 $29.86 $75.41 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $45.55 $29.86 $75.41 Top 10% +160% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION $57.97 $40.22 $98.19 Above median +165% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $54.64 $30.95 $85.59 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: EXCLUDING HVAC PIPE INSTALLATION $62.09 $45.05 $107.14 +189% vs market $0.00 $0.00 $0.00 $0.00
ROOFER: INCLUDES ALL TYPES OF ROOFS $45.40 $29.14 $74.54 +111% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION $51.30 $51.55 $102.85 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $57.42 $34.17 $91.59 Above median +224% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER: FIRE SPRINKLERS $67.97 $39.35 $107.32 +189% vs market $0.00 $0.00 $0.00 $0.00
THE REMOVAL, ABATEMENT, ENCLOSURE AND DECONTAMINATION OF PERSONAL PROTECTIVE EQUIPMENT, CHEMICAL PROTECTIVE CLOTHING AND MACHINERY RELATING TO ASBESTO $28.37 $21.62 $49.99 $0.00 $0.00 $0.00 $0.00
TILE SETTER $64.90 $37.28 $102.18 Top 10% +262% vs market $0.00 $0.00 $0.00 $0.00
WORK FORTY FT. OR MORE ABOVE THE GROUND OR PROTECTIVE RIGGING: 10% PER HOUR ADDITIONAL. WORK WITH, OR THE REMOVAL OF, ASBESTOS MATERIALS: 112% TIMES T $65.43 $42.86 $108.29 $0.00 $0.00 $0.00 $0.00
WORK GROUTING ALL EPOXY: $10.00 ADDITIONAL PER DAY $50.05 $33.90 $83.95 $0.00 $0.00 $0.00 $0.00
WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH AS CONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES $58.84 $35.06 $93.90 Top 10% $0.00 $0.00 $0.00 $0.00
WORK ON HIGH STACKS: 22% PER HOUR ADDITIONAL $49.60 $37.96 $87.56 $0.00 $0.00 $0.00 $0.00
WORK WELDING OR USING A CUTTING TORCH: $1.00 PER HOUR WORK ON A SWING STAGE SCAFFOLD; ON A PIPE SCAFFOLD PROVIDING THE WORKING HEIGHT OF THE PLATFORM $52.68 $31.29 $83.97 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Passaic, NJ — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Passaic

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NJ20260040-16036-bld →