Residential Construction — Cape May, New Jersey

WD NJ20260009-16033-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Cape May, New Jersey (construction type: residential) is $49.60/hr base + $37.96/hr fringe = $87.56/hr total package (WD NJ20260009-16033-res, Rev. 1).

Scroll down for all 16 trade classifications covered by this determination.

WD Number: NJ20260009-16033-res
Revision: 1
Construction Type: residential
State: New Jersey (NJ)
County: Cape May
Effective: May 17, 2026
Trades covered: 16
Official source: SAM.gov reference NJ20260009View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $49.60 $37.96 $87.56 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $48.27 $11.38 $59.65 Above median +101% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON $45.20 $33.26 $78.46 Top 10% +157% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $55.05 $48.76 $103.81 Top 10% +195% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: REINFORCING $53.24 $40.40 $93.64 +74% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKERS: STRUCTURAL $54.24 $40.40 $94.64 +76% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.10 $6.90 $24.00 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER: CEMENT/CONCRETE $29.35 $23.07 $52.42 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE PUMP, TRUCK MOUNTED $13.50 $2.34 $15.84 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $22.03 $15.62 $37.65 +30% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $31.50 $13.41 $44.91 +21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE INCLUDING BACKHOE TRACK; CRANE; FRONT END LOADER 5 CU YD AND OVER. PAID HOLIDAYS: New Year's Day, Washington's Birt $61.72 $37.50 $99.22 +145% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BACKHOE LOADER COMBO; FRONT END LOADER 2 YD < 5 CU YD; HYDRAULIC CRANE < 10 CU YD. PAID HOLIDAYS: New Year's Day, Washingto $60.13 $37.50 $97.63 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: BULLDOZER; ROLLER BLACKTOP; FRONT END LOADER 1 < 2 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed, Me $58.22 $37.50 $95.72 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATORS: ROLLER INCLUDING SUBGRADE ROLLER; FRONT END LOADER < 1 CU YD. PAID HOLIDAYS: New Year's Day, Washington's Birthday observed $56.59 $37.50 $94.09 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $34.35 $21.75 $56.10 Above median +59% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cape May, NJ — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cape May

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NJ20260009-16033-res →