Highway Construction — Strafford, New Hampshire

WD NH20260041-17900-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Strafford, New Hampshire (construction type: highway) is $24.04/hr base + $2.60/hr fringe = $26.64/hr total package (WD NH20260041-17900-hwy, Rev. 1).

Scroll down for all 31 trade classifications covered by this determination.

WD Number: NH20260041-17900-hwy
Revision: 1
Construction Type: highway
State: New Hampshire (NH)
County: Strafford
Effective: May 17, 2026
Trades covered: 31
Official source: SAM.gov reference NH20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $24.04 $2.60 $26.64 -7% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $26.23 $2.51 $28.74 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.78 $0.00 $21.78 -12% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $29.00 $2.78 $31.78 +7% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $19.59 $0.00 $19.59 Top 10% $0.00 $0.00 $0.00 $0.00
HIGHWAY/PARKING LOT STRIPING: PAINTER $20.87 $0.00 $20.87 Above median $0.00 $0.00 $0.00 $0.00
INSTALLER - GUARDRAIL $29.70 $8.11 $37.81 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.21 $8.19 $30.40 Above median +3% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $34.45 $17.20 $51.65 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $20.38 $5.47 $25.85 Above median +12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.79 $2.60 $21.39 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $18.21 $0.00 $18.21 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $19.64 $4.83 $24.47 Above median +6% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: AUGER $26.07 $0.00 $26.07 $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $26.43 $5.27 $31.70 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.01 $9.93 $34.94 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $25.08 $4.60 $29.68 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BUCKET $30.00 $0.00 $30.00 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $25.97 $6.59 $32.56 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $29.76 $3.29 $33.05 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $27.56 $6.56 $34.12 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $25.93 $5.55 $31.48 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $24.33 $8.36 $32.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $28.55 $6.88 $35.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $27.93 $5.10 $33.03 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POUNDER $36.21 $9.46 $45.67 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $24.43 $4.32 $28.75 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $27.29 $6.95 $34.24 +44% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.05 $1.37 $13.42 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $21.41 $4.05 $25.46 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: LOWBOY TRUCK $22.75 $4.95 $27.70 Above median -2% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Strafford, NH — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Strafford

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NH20260041-17900-hwy →