Heavy Construction — Strafford, New Hampshire

WD NH20260026-17900-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Strafford, New Hampshire (construction type: heavy) is $26.83/hr base + $6.94/hr fringe = $33.77/hr total package (WD NH20260026-17900-hvy, Rev. 1).

Scroll down for all 18 trade classifications covered by this determination.

WD Number: NH20260026-17900-hvy
Revision: 1
Construction Type: heavy
State: New Hampshire (NH)
County: Strafford
Effective: May 17, 2026
Trades covered: 18
Official source: SAM.gov reference NH20260026View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $26.83 $6.94 $33.77 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $27.46 $13.30 $40.76 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $25.70 $11.47 $37.17 +25% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $33.65 $26.12 $59.77 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $23.70 $1.54 $25.24 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.36 $2.19 $19.55 Above median -15% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $24.54 $9.84 $34.38 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $25.55 $5.74 $31.29 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.70 $4.09 $25.79 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $28.37 $9.74 $38.11 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $27.15 $13.39 $40.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.37 $12.98 $39.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $27.10 $5.69 $32.79 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $24.09 $4.43 $28.52 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $33.55 $19.15 $52.70 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $45.76 $26.19 $71.95 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $17.24 $1.54 $18.78 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.02 $5.73 $24.75 Above median -12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Strafford, NH — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Strafford

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NH20260026-17900-hvy →