Highway Construction — Belknap, New Hampshire

WD NH20260032-17901-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Belknap, New Hampshire (construction type: highway) is $19.82/hr base + $0.42/hr fringe = $20.24/hr total package (WD NH20260032-17901-hwy, Rev. 1).

Scroll down for all 23 trade classifications covered by this determination.

WD Number: NH20260032-17901-hwy
Revision: 1
Construction Type: highway
State: New Hampshire (NH)
County: Belknap
Effective: May 17, 2026
Trades covered: 23
Official source: SAM.gov reference NH20260032View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $19.82 $0.42 $20.24 -30% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $27.72 $2.24 $29.96 Above median +4% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.50 $0.00 $18.50 -25% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $22.51 $2.32 $24.83 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $16.95 $3.87 $20.82 Above median -10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.38 $2.81 $20.19 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $20.36 $0.00 $20.36 Above median -12% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $24.07 $4.47 $28.54 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $23.77 $7.02 $30.79 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $19.23 $2.89 $22.12 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.35 $0.00 $24.35 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $27.81 $7.02 $34.83 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $28.55 $0.53 $29.08 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $21.21 $3.80 $25.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $24.73 $6.96 $31.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $26.06 $3.38 $29.44 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $22.87 $5.77 $28.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: POUNDER $40.22 $3.97 $44.19 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $19.34 $5.12 $24.46 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $26.70 $11.07 $37.77 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $16.02 $2.21 $18.23 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $20.00 $3.42 $23.42 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $20.14 $4.27 $24.41 Above median -13% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Belknap, NH — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Belknap

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NH20260032-17901-hwy →