Heavy Construction — Belknap, New Hampshire

WD NH20260004-17901-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Belknap, New Hampshire (construction type: heavy) is $22.50/hr base + $3.32/hr fringe = $25.82/hr total package (WD NH20260004-17901-hvy, Rev. 1).

Scroll down for all 9 trade classifications covered by this determination.

WD Number: NH20260004-17901-hvy
Revision: 1
Construction Type: heavy
State: New Hampshire (NH)
County: Belknap
Effective: May 17, 2026
Trades covered: 9
Official source: SAM.gov reference NH20260004View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $22.50 $3.32 $25.82 -10% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $47.58 $29.90 $77.48 Above median +160% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $21.00 $1.89 $22.89 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $27.25 $6.44 $33.69 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $25.00 $2.21 $27.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $27.10 $7.06 $34.16 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.00 $3.23 $29.23 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $18.00 $6.90 $24.90 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $22.00 $6.77 $28.77 Above median +2% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Belknap, NH — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Belknap

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NH20260004-17901-hvy →