Heavy Construction — Lyon, Nevada

WD NV20260022-17483-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Lyon, Nevada (construction type: heavy) is $57.69/hr base + $21.53/hr fringe = $79.22/hr total package (WD NV20260022-17483-hvy, Rev. 2).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: NV20260022-17483-hvy
Revision: 2
Construction Type: heavy
State: Nevada (NV)
County: Lyon
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference NV20260022View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $57.69 $21.53 $79.22 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $40.26 $0.00 $40.26 Above median +38% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.09 $14.29 $53.38 +71% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $50.70 $35.15 $85.85 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $46.20 $34.30 $80.50 Top 10% +166% vs market $0.00 $0.00 $0.00 $0.00
LABORER $34.69 $31.21 $65.90 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $33.95 $16.30 $50.25 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( CONCRETE SAW; MASON TENDER - CEMENT/CONCRETE;) $34.20 $16.30 $50.50 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( PIPELAYER) $34.45 $16.30 $50.75 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $39.45 $20.06 $59.51 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $47.73 $9.05 $56.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $32.97 $17.65 $50.62 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 10A GRADER/BLADE $50.47 $30.38 $80.85 +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 12 CRANE OPERATOR $65.99 $36.40 $102.39 Top 10% +193% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 16 CRANE OPERATOR $67.41 $36.40 $103.81 Top 10% +197% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 17 CRANE OPERATOR $67.91 $36.40 $104.31 Top 10% +198% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 19 CRANE OPERATOR $69.94 $36.40 $106.34 Top 10% +204% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 20 CRANE OPERATOR $70.55 $36.40 $106.95 Top 10% +206% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 21 CRANE OPERATOR $71.16 $36.40 $107.56 Top 10% +207% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 22 CRANE OPERATOR $71.92 $36.40 $108.32 Top 10% +210% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR, CRANE: GROUP 23 CRANE OPERATOR $72.38 $36.40 $108.78 Top 10% +211% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 06 ROLLER OPERATOR $48.77 $30.38 $79.15 +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 07 SCREED/SCREEDMAN $49.02 $30.38 $79.40 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 08 LOADER $49.61 $30.38 $79.99 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $31.77 $4.16 $35.93 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $16.64 $4.16 $20.80 Above median -29% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lyon, NV — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lyon

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NV20260022-17483-hvy →