Building Construction — Lyon, Nevada

WD NV20260033-17483-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Lyon, Nevada (construction type: building) is $52.36/hr base + $26.62/hr fringe = $78.98/hr total package (WD NV20260033-17483-bld, Rev. 1).

Scroll down for all 15 trade classifications covered by this determination.

WD Number: NV20260033-17483-bld
Revision: 1
Construction Type: building
State: Nevada (NV)
County: Lyon
Effective: May 17, 2026
Trades covered: 15
Official source: SAM.gov reference NV20260033View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $52.36 $26.62 $78.98 Above median +165% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $27.64 $9.87 $37.51 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.73 $0.00 $30.73 +6% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.50 $23.04 $71.54 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $50.70 $35.15 $85.85 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( COMMON OR GENERAL) $33.95 $16.30 $50.25 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( MASON TENDER - CEMENT/CONCRETE) $34.20 $16.30 $50.50 +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER ( PIPELAYER) $34.45 $16.30 $50.75 Top 10% +121% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $45.02 $10.71 $55.73 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $37.68 $6.04 $43.72 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $44.95 $8.42 $53.37 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $39.43 $15.71 $55.14 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $41.43 $15.71 $57.14 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $27.48 $15.52 $43.00 +49% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $47.51 $29.38 $76.89 Above median +236% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lyon, NV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lyon

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for NV20260033-17483-bld →