Building Construction — Missoula, Montana

WD MT20260063-17853-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 in Missoula, Montana (construction type: building) is $32.05/hr base + $15.02/hr fringe = $47.07/hr total package (WD MT20260063-17853-bld, Rev. 2).

Scroll down for all 19 trade classifications covered by this determination.

WD Number: MT20260063-17853-bld
Revision: 2
Construction Type: building
State: Montana (MT)
County: Missoula
Effective: May 17, 2026
Trades covered: 19
Official source: SAM.gov reference MT20260063View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 $32.05 $15.02 $47.07 Top 10% $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $32.88 $16.20 $49.08 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 +78% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.11 $16.69 $49.80 +59% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.71 $17.94 $58.65 +77% vs market $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68 Top 10% $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: COMMON OR GENERAL ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE $23.05 $12.72 $35.77 +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING TH $23.05 $12.72 $35.77 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FR $33.00 $13.57 $46.57 +62% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $20.56 $6.35 $26.91 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND SPRAY $18.35 $6.84 $25.19 +7% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $17.00 $0.00 $17.00 -28% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION $42.80 $17.28 $60.08 +60% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER, INCLUDES HVAC PIPE INSTALLATION $42.80 $17.28 $60.08 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO $31.51 $16.20 $47.71 +65% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $30.97 $13.46 $44.43 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.07 $22.07 $62.14 Above median +109% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $39.97 $24.40 $64.37 +72% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; ME $67.61 $38.44 $106.05 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Missoula, MT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Missoula

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260063-17853-bld →