Building Construction — Madison, Montana

WD MT20260042-17755-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 3: OVER 60 MILES - $4.00 in Madison, Montana (construction type: building) is $32.05/hr base + $15.05/hr fringe = $47.10/hr total package (WD MT20260042-17755-bld, Rev. 1).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: MT20260042-17755-bld
Revision: 1
Construction Type: building
State: Montana (MT)
County: Madison
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference MT20260042View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
3: OVER 60 MILES - $4.00 $32.05 $15.05 $47.10 $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.75 $32.31 $71.06 +78% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.11 $17.18 $50.29 +61% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK $25.00 $5.30 $30.30 Top 10% +8% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $18.27 $1.50 $19.77 -26% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $40.00 $19.88 $59.88 +81% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $17.93 $2.62 $20.55 -12% vs market $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR $43.81 $21.87 $65.68 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.83 $25.30 $62.13 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER, ZONE 1: MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING TH $23.05 $12.72 $35.77 Top 10% +51% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.50 $5.30 $22.80 Above median -4% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.04 $7.41 $31.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $22.20 $6.75 $28.95 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.44 $8.05 $29.49 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING $19.18 $0.00 $19.18 Top 10% -18% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $46.45 $19.92 $66.37 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $46.45 $19.92 $66.37 Above median +77% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.48 $5.28 $20.76 -12% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.00 $22.07 $62.07 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $39.97 $24.40 $64.37 +72% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.36 $5.37 $24.73 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; ME $67.61 $38.44 $106.05 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Madison, MT — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.