Heavy Construction — Custer, Montana

WD MT20260069-17739-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 in Custer, Montana (construction type: heavy) is $42.23/hr base + $16.20/hr fringe = $58.43/hr total package (WD MT20260069-17739-hvy, Rev. 1).

Scroll down for all 20 trade classifications covered by this determination.

WD Number: MT20260069-17739-hvy
Revision: 1
Construction Type: heavy
State: Montana (MT)
County: Custer
Effective: May 17, 2026
Trades covered: 20
Official source: SAM.gov reference MT20260069View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $42.23 $16.20 $58.43 Top 10% $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $41.15 $16.20 $57.35 Above median $0.00 $0.00 $0.00 $0.00
60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 $24.34 $10.40 $34.74 Bottom 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $24.30 $7.80 $32.10 +15% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $21.13 $7.00 $28.13 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.92 $18.17 $62.09 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.83 $25.30 $62.13 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.99 $5.90 $23.89 Above median +1% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE AND IRRIGATION $15.14 $1.30 $16.44 Above median -31% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $21.10 $5.28 $26.38 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $20.97 $8.05 $29.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $23.05 $8.05 $31.10 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $25.44 $8.45 $33.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $23.02 $8.05 $31.07 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCRAPER $23.00 $6.76 $29.76 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPEARTOR: ZONE 1:A-FRAME TRUCK CRANE, OILER. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH P $23.47 $10.40 $33.87 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANE OILER, BULLDOZER, ROLLER, BACKHOE. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLIC $23.94 $10.40 $34.34 Top 10% +19% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 25-44 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT S $38.98 $16.20 $55.18 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ZONE 1: CRANES 45 TONS TO AND INCL. 74 TONS. ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE $40.07 $16.20 $56.27 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.99 $5.09 $25.08 Above median -12% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Custer, MT — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Custer

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for MT20260069-17739-hvy →