Davis-Bacon Wage Determinations — Custer, Montana
Custer has 4 active Davis-Bacon wage determinations. Select a construction type to view trade rates and fringe benefit requirements.
Quick Answer
Davis-Bacon prevailing wage determinations for Custer, Montana cover 4 construction types: Building, Heavy, Highway and Residential. Each determination sets the minimum base hourly wage and fringe benefits per trade classification for federal construction projects in the county. Select a construction type below for the full trade-by-trade rate table.
building
Active
WD: MT20260057-17739-bld Rev. 1
Effective: May 17, 2026
View trade rates →
heavy
Active
WD: MT20260069-17739-hvy Rev. 1
Effective: May 17, 2026
View trade rates →
highway
Active
WD: MT20260080-17739-hwy Rev. 2
Effective: May 17, 2026
View trade rates →
residential
Active
WD: MT20260019-17739-res Rev. 1
Effective: May 17, 2026
View trade rates →
Top-Paying Trades in Custer
Highest Davis-Bacon total packages (base + fringe) across this county's wage determinations. Each row shows the construction type that yields the highest rate for that trade.
| # | Trade | Construction Type | Base $/hr | Fringe $/hr | Total Package | |
|---|---|---|---|---|---|---|
| 1 | DIVER Diving | highway | $92.66 | $18.38 | $111.04 | WD → |
| 2 | DIVER: Diving | highway | $92.66 | $18.38 | $111.04 | WD → |
| 3 | ELEVATOR MECHANIC FOOTNOTE: ADDITIONAL FRINGE BENEFITS DUE A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE | building | $67.61 | $38.44 | $106.05 | WD → |
| 4 | BOILERMAKER | building | $38.75 | $32.31 | $71.06 | WD → |
| 5 | LINE CONSTRUCTION: Lineman | highway | $50.11 | $19.88 | $69.99 | WD → |
| 6 | LINE CONSTRUCTION Lineman | highway | $50.11 | $19.88 | $69.99 | WD → |
| 7 | MILLWRIGHT ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FRO | building | $46.21 | $23.50 | $69.71 | WD → |
| 8 | MILLWRIGHT | building | $46.21 | $23.50 | $69.71 | WD → |
| 9 | PLUMBER/PIPEFITTER | building | $46.45 | $19.92 | $66.37 | WD → |
| 10 | PLUMBER/PIPEFITTER: EXCLUDING HVAC PIPE INSTALLATION | building | $46.45 | $19.92 | $66.37 | WD → |
Each wage determination above lists the minimum hourly base rate and required fringe benefits per trade classification. Full Davis-Bacon compliance guide →