Residential Construction — Walthall, Mississippi
WD MS20260022-15670-res · Revision 2 · Effective May 17, 2026
The Davis-Bacon prevailing wage for BRICKLAYER in Walthall, Mississippi (construction type: residential) is $18.30/hr base + $0.00/hr fringe = $18.30/hr total package (WD MS20260022-15670-res, Rev. 2).
Scroll down for all 14 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| BRICKLAYER | $18.30 | $0.00 | $18.30 -23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDES FORM WORK | $12.83 | $0.00 | $12.83 Bottom 10% -42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $10.00 | $0.00 | $10.00 Bottom 10% -53% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $30.35 | $11.39 | $41.74 +52% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $32.90 | $11.10 | $44.00 +60% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $7.25 | $0.00 | $7.25 Bottom 10% -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $8.03 | $0.00 | $8.03 Bottom 10% -55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: PIPELAYER | $8.31 | $0.00 | $8.31 Bottom 10% -54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $13.63 | $0.00 | $13.63 | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $13.13 | $0.00 | $13.13 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $10.00 | $0.00 | $10.00 -49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $11.42 | $0.00 | $11.42 Bottom 10% -59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER, INCLUDES SHAKE & SHINGLE ROOFS | $10.89 | $0.00 | $10.89 Above median -44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $8.65 | $0.00 | $8.65 Bottom 10% -65% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Walthall, MS — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Compliance Notes
- This wage determination applies to federal contracts for residential construction in Walthall, Mississippi.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.